WindOperatingMISO

CG Windfarm LLC

Wind power plant in Pipestone County, Minnesota. 2 MW of nameplate capacity across 1 generator, operated by CG Windfarm LLC.

Also known as CG Windfarm · EIA plant 56200

Analyst: free account, 1 question a day.

Tofteland Windfarm LLCPipestone City Solar LLC CSGCG Windfarm5 km
Open in the map
6 plants within 8.5 km, from EIA coordinates.

Key facts

Capacity
2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2003First generator online
Operator
CG Windfarm LLCEIA operator ID 61140
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Pipestone County, MN43.9931, −96.2186
EIA plant ID
56200EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power CG Windfarm produces

Free · EIA-923

Net generation, 2025

Not reported

Not reported MWh, final. 0 of 12 months reported

Capacity factor, 2025

Not reported

2024: 0.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2024

0.0–2.7

GWh a year. Low 2016, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
20046,132Not reported12 of 12
20056,055Not reported12 of 12
20066,193Not reported12 of 12
20075,724Not reported12 of 12
20086,859Not reported12 of 12
20094,560Not reported12 of 12
20103,42719.6%12 of 12
20114,99828.5%12 of 12
20125,93533.8%12 of 12
20134,70326.8%12 of 12
20146,72338.4%12 of 12
20152,65715.2%12 of 12
201600.0%12 of 12
20171,4798.4%12 of 12
20182,29713.1%12 of 12
20192,25012.8%12 of 12
20201,6899.6%12 of 12
20211,6589.5%12 of 12
20222,34513.4%12 of 12
20232,40013.7%12 of 12
20241440.8%12 of 12
2025Not reportedNot reported0 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
IOnshore Wind Turbine2.0December 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists CG Windfarm LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query CG Windfarm LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near CG Windfarm

Questions about CG Windfarm

Where is CG Windfarm LLC?

CG Windfarm LLC is in Pipestone County, Minnesota, at 43.9931, −96.2186. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates CG Windfarm LLC?

EIA-860M for August 2026 lists CG Windfarm LLC as the operator (EIA operator ID 61140). The operator is not always the owner.

When did CG Windfarm LLC start operating?

Its first generator began operating in December 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page