WindOperatingMISO

Lucky Wind

Wind power plant in Pipestone County, Minnesota. 1.7 MW of nameplate capacity across 1 generator, operated by Lucky Wind, LLC (Longroad).

Also known as EIA plant 56412

Analyst: free account, 1 question a day.

Greenback EnergyNorthern Lights Wind LLCStahl Wind EnergyUilk Wind LLCLucky Wind2 km
Open in the map
5 plants within 4.6 km, from EIA coordinates.

Key facts

Capacity
1.7 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2004First generator online
Operator
Lucky Wind, LLC (Longroad)EIA operator ID 65909
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Pipestone County, MN44.0211, −96.4406
EIA plant ID
56412EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lucky Wind produces

Free · EIA-923

Net generation, 2025

3.31 GWh

3,310 MWh, final

Capacity factor, 2025

22.2%

2024: 14.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.6–5.3

GWh a year. Low 2023, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
20054,642Not reported12 of 12
20065,159Not reported12 of 12
20075,577Not reported12 of 12
20085,438Not reported12 of 12
20095,021Not reported12 of 12
20104,48130.1%12 of 12
20115,29235.5%12 of 12
20125,39036.1%12 of 12
20135,10734.3%12 of 12
20145,83939.2%12 of 12
20155,34035.9%12 of 12
20165,06033.9%12 of 12
20174,95033.2%12 of 12
20184,70831.6%12 of 12
20194,35729.3%12 of 12
20203,02720.3%12 of 12
20214,34629.2%12 of 12
20222,39816.1%12 of 12
20235763.9%12 of 12
20242,16114.5%12 of 12
20253,31022.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine1.7December 2004

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Lucky Wind, LLC (Longroad) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lucky Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lucky Wind

Questions about Lucky Wind

How much power does Lucky Wind produce?

Lucky Wind reported 3,310 MWh (3.31 GWh) of net generation in 2025, a 22.2% capacity factor on 1.7 MW of nameplate capacity.

Where is Lucky Wind?

Lucky Wind is in Pipestone County, Minnesota, at 44.0211, −96.4406. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Lucky Wind?

EIA-860M for August 2026 lists Lucky Wind, LLC (Longroad) as the operator (EIA operator ID 65909). The operator is not always the owner.

When did Lucky Wind start operating?

Its first generator began operating in December 2004, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page