Natural gasOperatingCAISO

Mira Loma Peaker

Natural gas power plant in San Bernardino County, California. 49.8 MW of nameplate capacity across 1 generator, operated by Southern California Edison Co.

Also known as Mira Loma Peaker Unit · EIA plant 56473

Analyst: free account, 1 question a day.

Chambers 4 - Eastvale LGB3Chambers 4 - Eastvale DCA2Mira LomaPVN Milliken, LLCSunE- E Philadelphia OntarioMira Loma Peaker2 km
Open in the map
6 plants within 4.1 km, from EIA coordinates.

Key facts

Capacity
49.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2007First generator online
Operator
Southern California Edison CoEIA operator ID 17609
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Bernardino County, CA34.0053, −117.5604
EIA plant ID
56473EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Mira Loma Peaker produces

Free · EIA-923

Net generation, 2025

1.05 GWh

1,052 MWh, final

Capacity factor, 2025

0.2%

2024: 2.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.1–32.6

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
20077,388Not reported12 of 12
20084,451Not reported12 of 12
20092,001Not reported12 of 12
20104,7731.1%12 of 12
20114,9701.1%12 of 12
201221,4554.9%12 of 12
201315,1653.5%12 of 12
201416,5303.8%12 of 12
201525,5515.9%12 of 12
201632,5937.5%12 of 12
201724,4045.6%12 of 12
201824,0085.5%12 of 12
201916,6053.8%12 of 12
202020,2514.6%12 of 12
202123,9355.5%12 of 12
202228,3706.5%12 of 12
202311,1722.6%12 of 12
202411,2672.6%12 of 12
20251,0520.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

1,359

US short tons. 2024: 7,029

SO₂, 2025

0

US short tons

NOx, 2025

0

US short tons

CO₂ per MWh, calculated

1.29 t

About 2,584 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (CT1), matched to EIA plant 56473 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine49.8September 2007

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Southern California Edison Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Mira Loma Peaker and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Mira Loma Peaker

More plants operated by Southern California Edison Co

Questions about Mira Loma Peaker

How much power does Mira Loma Peaker produce?

Mira Loma Peaker reported 1,052 MWh (1.05 GWh) of net generation in 2025, a 0.2% capacity factor on 49.8 MW of nameplate capacity.

Where is Mira Loma Peaker?

Mira Loma Peaker is in San Bernardino County, California, at 34.0053, −117.5604. It is in the California Independent System Operator balancing area (CISO).

Who operates Mira Loma Peaker?

EIA-860M for August 2026 lists Southern California Edison Co as the operator (EIA operator ID 17609). The operator is not always the owner.

When did Mira Loma Peaker start operating?

Its first generator began operating in September 2007, according to EIA-860M.

Does InfraMap have power prices for Mira Loma Peaker?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Mira Loma Peaker, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page