Natural gasOperatingCAISO

Gateway Generating Station

Natural gas power plant in Contra Costa County, California. 619.7 MW of nameplate capacity across 3 generators, operated by Pacific Gas & Electric Co..

Also known as EIA plant 56476

Analyst: free account, 1 question a day.

Oakley Solar ProjectCSD 2- Freedom HighKaiser Deer Valley Rd…Gateway2 km
Open in the map
6 plants within 7.4 km, from EIA coordinates.

Key facts

Capacity
619.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
January 2009First generator online
Operator
Pacific Gas & Electric Co.EIA operator ID 14328
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Contra Costa County, CA38.0175, −121.7587
EIA plant ID
56476EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gateway produces

Free · EIA-923

Net generation, 2025

2.91 TWh

2,911,928 MWh, final

Capacity factor, 2025

53.6%

2024: 52.7%

January to July 2026

822 GWh

Provisional

Range, 2015 to 2025

2.4–3.4

TWh a year. Low 2016, high 2021

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009152,165Not reported1 of 12
20103,099,25057.1%12 of 12
20112,647,97348.8%12 of 12
20123,172,09258.3%12 of 12
20133,182,079Not reported12 of 12
2014Not reportedNot reported0 of 12
20153,310,82361.0%12 of 12
20162,435,95044.8%12 of 12
20172,779,79851.2%12 of 12
20182,929,75154.0%12 of 12
20192,872,85852.9%12 of 12
20202,855,30052.5%12 of 12
20213,433,17863.2%12 of 12
20222,438,70544.9%12 of 12
20233,085,20856.8%12 of 12
20242,866,95152.7%12 of 12
20252,911,92853.6%12 of 12
2026 (provisional, partial year)821,70726.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

1.26M

US short tons. 2024: 1.23M

SO₂, 2025

6

US short tons

NOx, 2025

75

US short tons

CO₂ per MWh, calculated

0.43 t

About 867 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (GT1, GT2), matched to EIA plant 56476 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Not reported

Dry cooling

Watershed stress

High · 0.670

USGS SUI, HUC12 Markley Canyon-San Joaquin River

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
ANatural Gas Fired Combined Cycle203.2January 2009
BNatural Gas Fired Combined Cycle203.2January 2009
CNatural Gas Fired Combined Cycle213.3January 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Pacific Gas & Electric Co. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gateway Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gateway

More plants operated by Pacific Gas & Electric Co.

Questions about Gateway

How much power does Gateway Generating Station produce?

Gateway Generating Station reported 2,911,928 MWh (2.91 TWh) of net generation in 2025, a 53.6% capacity factor on 619.7 MW of nameplate capacity. From January to July 2026 it reported 822 GWh, which is provisional.

Where is Gateway Generating Station?

Gateway Generating Station is in Contra Costa County, California, at 38.0175, −121.7587. It is in the California Independent System Operator balancing area (CISO).

Who operates Gateway Generating Station?

EIA-860M for August 2026 lists Pacific Gas & Electric Co. as the operator (EIA operator ID 14328). The operator is not always the owner.

When did Gateway Generating Station start operating?

Its first generator began operating in January 2009, according to EIA-860M.

Does InfraMap have power prices for Gateway Generating Station?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Gateway Generating Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page