Buffalo Gap 2 Wind Farm
Wind power plant in Nolan County, Texas. 232.5 MW of nameplate capacity across 1 generator, operated by AES Distributed Energy.
Also known as Buffalo Gap 2 · EIA plant 56484
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 232.5 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- July 2007First generator online
- Operator
- AES Distributed EnergyEIA operator ID 61012
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Nolan County, TX32.3182, −100.1770
- EIA plant ID
- 56484EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Buffalo Gap 2 Wind Farm produces
Free · EIA-923Net generation, 2025
350 GWh
350,443 MWh, final
Capacity factor, 2025
17.2%
2024: 19.3%
January to July 2026
0 MWh
Provisional
Range, 2015 to 2025
350.4–673.4
GWh a year. Low 2025, high 2016
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | 289,344 | Not reported | 6 of 12 |
| 2008 | 592,112 | Not reported | 12 of 12 |
| 2009 | 343,888 | Not reported | 12 of 12 |
| 2010 | 656,526 | 32.2% | 12 of 12 |
| 2011 | 748,033 | 36.7% | 12 of 12 |
| 2012 | 716,153 | 35.1% | 12 of 12 |
| 2013 | 680,246 | 33.4% | 12 of 12 |
| 2014 | 705,214 | 34.6% | 12 of 12 |
| 2015 | 595,982 | 29.3% | 12 of 12 |
| 2016 | 673,377 | 33.0% | 12 of 12 |
| 2017 | 650,578 | 31.9% | 12 of 12 |
| 2018 | 623,620 | 30.6% | 12 of 12 |
| 2019 | 609,080 | 29.9% | 12 of 12 |
| 2020 | 483,505 | 23.7% | 12 of 12 |
| 2021 | 464,104 | 22.8% | 12 of 12 |
| 2022 | 404,206 | 19.8% | 12 of 12 |
| 2023 | 424,857 | 20.9% | 12 of 12 |
| 2024 | 393,227 | 19.3% | 12 of 12 |
| 2025 | 350,443 | 17.2% | 12 of 12 |
| 2026 (provisional, partial year) | 0 | 0.0% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Onshore Wind Turbine | 232.5 | July 2007 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists AES Distributed Energy as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Buffalo Gap 2 Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Buffalo Gap 2 Wind Farm
More plants operated by AES Distributed Energy
Questions about Buffalo Gap 2 Wind Farm
How much power does Buffalo Gap 2 Wind Farm produce?
Buffalo Gap 2 Wind Farm reported 350,443 MWh (350 GWh) of net generation in 2025, a 17.2% capacity factor on 232.5 MW of nameplate capacity. From January to July 2026 it reported 0 MWh, which is provisional.
Where is Buffalo Gap 2 Wind Farm?
Buffalo Gap 2 Wind Farm is in Nolan County, Texas, at 32.3182, −100.1770. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Buffalo Gap 2 Wind Farm?
EIA-860M for August 2026 lists AES Distributed Energy as the operator (EIA operator ID 61012). The operator is not always the owner.
When did Buffalo Gap 2 Wind Farm start operating?
Its first generator began operating in July 2007, according to EIA-860M.
Does InfraMap have power prices for Buffalo Gap 2 Wind Farm?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Buffalo Gap 2 Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page