Key facts

Capacity
152 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 2001First generator online
Operator
Invenergy Services LLCEIA operator ID 49893
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Nolan County, TX32.4301, −100.2357
EIA plant ID
55968EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Trent Wind Farm produces

Free · EIA-923

Net generation, 2025

526 GWh

525,650 MWh, final

Capacity factor, 2025

39.5%

2024: 38.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

366.3–580.1

GWh a year. Low 2018, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002431,731Not reported12 of 12
2003462,420Not reported12 of 12
2004509,904Not reported12 of 12
2005492,653Not reported12 of 12
2006508,556Not reported12 of 12
2007434,550Not reported12 of 12
2008487,443Not reported12 of 12
2009347,322Not reported12 of 12
2010380,11928.9%12 of 12
2011423,29132.2%12 of 12
2012440,95633.5%12 of 12
2013451,20534.3%12 of 12
2014437,98133.3%12 of 12
2015376,42428.6%12 of 12
2016425,09232.3%12 of 12
2017403,05230.7%12 of 12
2018366,325Not reported12 of 12
2019580,08943.6%12 of 12
2020555,84041.6%12 of 12
2021533,55740.1%12 of 12
2022548,79041.2%12 of 12
2023535,53340.2%12 of 12
2024515,02538.6%12 of 12
2025525,65039.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
WTG1Onshore Wind Turbine152.0July 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Invenergy Services LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Trent Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Trent Wind Farm

More plants operated by Invenergy Services LLC

Questions about Trent Wind Farm

How much power does Trent Wind Farm produce?

Trent Wind Farm reported 525,650 MWh (526 GWh) of net generation in 2025, a 39.5% capacity factor on 152 MW of nameplate capacity.

Where is Trent Wind Farm?

Trent Wind Farm is in Nolan County, Texas, at 32.4301, −100.2357. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Trent Wind Farm?

EIA-860M for August 2026 lists Invenergy Services LLC as the operator (EIA operator ID 49893). The operator is not always the owner.

When did Trent Wind Farm start operating?

Its first generator began operating in July 2001, according to EIA-860M.

Does InfraMap have power prices for Trent Wind Farm?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Trent Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page