Eastridge Wind Project

Wind power plant in Murray County, Minnesota. 10.4 MW of nameplate capacity across 1 generator, operated by Eastridge Wind Project.

Also known as East Ridge · EIA plant 56543

Analyst: free account, 1 question a day.

Bavaria Solar LLCWindshare LLCPlatt SolarLeo Community SolarValley View Transmission LLCEastridge Wind Project2 km
Open in the map
6 plants within 8.8 km, from EIA coordinates.

Key facts

Capacity
10.4 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 2006First generator online
Operator
Eastridge Wind ProjectEIA operator ID 62005
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Murray County, MN43.9358, −95.9222
EIA plant ID
56543EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Eastridge Wind Project produces

Free · EIA-923

Net generation, 2025

13.8 GWh

13,847 MWh, final

Capacity factor, 2025

15.2%

2024: 20.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

13.8–27.8

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
200616,501Not reported12 of 12
200728,655Not reported12 of 12
200838,234Not reported12 of 12
200924,899Not reported12 of 12
201025,54828.0%12 of 12
201126,71229.3%12 of 12
201227,31329.9%12 of 12
201326,30328.9%12 of 12
201429,18032.0%12 of 12
201527,80430.5%12 of 12
201627,64330.3%12 of 12
201725,28227.8%12 of 12
201823,97826.3%12 of 12
201922,84725.1%12 of 12
202018,71020.5%12 of 12
202118,97120.8%12 of 12
202224,22326.6%12 of 12
202319,98721.9%12 of 12
202418,62520.4%12 of 12
202513,84715.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine10.4April 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Eastridge Wind Project as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Eastridge Wind Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Eastridge Wind Project

Questions about Eastridge Wind Project

How much power does Eastridge Wind Project produce?

Eastridge Wind Project reported 13,847 MWh (13.8 GWh) of net generation in 2025, a 15.2% capacity factor on 10.4 MW of nameplate capacity.

Where is Eastridge Wind Project?

Eastridge Wind Project is in Murray County, Minnesota, at 43.9358, −95.9222. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Eastridge Wind Project?

EIA-860M for August 2026 lists Eastridge Wind Project as the operator (EIA operator ID 62005). The operator is not always the owner.

When did Eastridge Wind Project start operating?

Its first generator began operating in April 2006, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page