WindOperatingSPP

Porterhouse Wind (4) LLC

Wind power plant in Hansford County, Texas. 79.8 MW of nameplate capacity across 1 generator, operated by UPC Power Solutions.

Also known as Exelon Wind 4 · JD Wind 4 · EIA plant 56560

Analyst: free account, 1 question a day.

Great Plains Windpark LLCGreat Prairie WindGoodwell Wind Project LLCPalo Duro WindPorterhouse Wind (4)25 km
Open in the map
6 plants within 44 km, from EIA coordinates.

Key facts

Capacity
79.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2008First generator online
Operator
UPC Power SolutionsEIA operator ID 65983
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Hansford County, TX36.4144, −101.3864
EIA plant ID
56560EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Porterhouse Wind (4) produces

Free · EIA-923

Net generation, 2025

66.2 GWh

66,198 MWh, final

Capacity factor, 2025

9.5%

2024: 1.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

8.7–249.8

GWh a year. Low 2024, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008147,643Not reported12 of 12
2009177,355Not reported12 of 12
2010208,72029.9%12 of 12
2011241,68934.6%12 of 12
2012246,49435.2%12 of 12
2013237,60434.0%12 of 12
2014252,87536.2%12 of 12
2015227,54132.6%12 of 12
2016249,81135.6%12 of 12
2017246,54835.3%12 of 12
2018195,67228.0%12 of 12
2019141,89220.3%12 of 12
202071,49810.2%12 of 12
202122,2293.2%12 of 12
202214,9342.1%12 of 12
202310,4741.5%12 of 12
20248,7391.2%12 of 12
202566,1989.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
JDW4Onshore Wind Turbine79.8January 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists UPC Power Solutions as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Porterhouse Wind (4) LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Porterhouse Wind (4)

More plants operated by UPC Power Solutions

Questions about Porterhouse Wind (4)

How much power does Porterhouse Wind (4) LLC produce?

Porterhouse Wind (4) LLC reported 66,198 MWh (66.2 GWh) of net generation in 2025, a 9.5% capacity factor on 79.8 MW of nameplate capacity.

Where is Porterhouse Wind (4) LLC?

Porterhouse Wind (4) LLC is in Hansford County, Texas, at 36.4144, −101.3864. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Porterhouse Wind (4) LLC?

EIA-860M for August 2026 lists UPC Power Solutions as the operator (EIA operator ID 65983). The operator is not always the owner.

When did Porterhouse Wind (4) LLC start operating?

Its first generator began operating in January 2008, according to EIA-860M.

Does InfraMap have power prices for Porterhouse Wind (4) LLC?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Porterhouse Wind (4) LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page