WindOperatingCAISO

Hatchet Ridge Wind Project

Wind power plant in Shasta County, California. 101.2 MW of nameplate capacity across 1 generator, operated by Pattern Operators LP.

Also known as Hatchett Ridge · EIA plant 56654

Analyst: free account, 1 question a day.

Burney Forest ProductsBurney CreekPit 4Pit 3Hatchet Ridge Wind Project5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
101.2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2010First generator online
Operator
Pattern Operators LPEIA operator ID 56545
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Shasta County, CA40.8981, −121.8036
EIA plant ID
56654EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hatchet Ridge Wind Project produces

Free · EIA-923

Net generation, 2025

271 GWh

271,346 MWh, final

Capacity factor, 2025

30.6%

2024: 30.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

248.5–292.4

GWh a year. Low 2023, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
20107,276Not reported1 of 12
2011269,91930.4%12 of 12
2012248,84328.0%12 of 12
2013280,22331.6%12 of 12
2014295,51233.3%12 of 12
2015266,26430.0%12 of 12
2016287,24032.3%12 of 12
2017292,43033.0%12 of 12
2018258,50329.2%12 of 12
2019252,36528.5%12 of 12
2020281,67731.7%12 of 12
2021284,58232.1%12 of 12
2022276,15531.2%12 of 12
2023248,46928.0%12 of 12
2024268,18430.2%12 of 12
2025271,34630.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine101.2December 2010

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Pattern Operators LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hatchet Ridge Wind Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hatchet Ridge Wind Project

More plants operated by Pattern Operators LP

Questions about Hatchet Ridge Wind Project

How much power does Hatchet Ridge Wind Project produce?

Hatchet Ridge Wind Project reported 271,346 MWh (271 GWh) of net generation in 2025, a 30.6% capacity factor on 101.2 MW of nameplate capacity.

Where is Hatchet Ridge Wind Project?

Hatchet Ridge Wind Project is in Shasta County, California, at 40.8981, −121.8036. It is in the California Independent System Operator balancing area (CISO).

Who operates Hatchet Ridge Wind Project?

EIA-860M for August 2026 lists Pattern Operators LP as the operator (EIA operator ID 56545). The operator is not always the owner.

When did Hatchet Ridge Wind Project start operating?

Its first generator began operating in December 2010, according to EIA-860M.

Does InfraMap have power prices for Hatchet Ridge Wind Project?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Hatchet Ridge Wind Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page