Key facts

Capacity
150 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2008First generator online
Operator
Invenergy Services LLCEIA operator ID 49893
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Dickens County, TX33.7522, −100.9674
EIA plant ID
56773EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power McAdoo Wind Energy produces

Free · EIA-923

Net generation, 2025

387 GWh

386,954 MWh, final

Capacity factor, 2025

29.4%

2024: 27.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

363.6–598.4

GWh a year. Low 2024, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008105,768Not reported4 of 12
2009434,122Not reported12 of 12
2010495,65937.7%12 of 12
2011599,61145.6%12 of 12
2012585,33844.4%12 of 12
2013579,05944.1%12 of 12
2014595,86245.3%12 of 12
2015532,74040.5%12 of 12
2016598,35045.4%12 of 12
2017571,78143.5%12 of 12
2018571,37443.5%12 of 12
2019512,47539.0%12 of 12
2020446,77233.9%12 of 12
2021408,44731.1%12 of 12
2022440,95933.6%12 of 12
2023395,08330.1%12 of 12
2024363,62227.6%12 of 12
2025386,95429.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine150.0September 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Invenergy Services LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query McAdoo Wind Energy LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near McAdoo Wind Energy

More plants operated by Invenergy Services LLC

Questions about McAdoo Wind Energy

How much power does McAdoo Wind Energy LLC produce?

McAdoo Wind Energy LLC reported 386,954 MWh (387 GWh) of net generation in 2025, a 29.4% capacity factor on 150 MW of nameplate capacity.

Where is McAdoo Wind Energy LLC?

McAdoo Wind Energy LLC is in Dickens County, Texas, at 33.7522, −100.9674. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates McAdoo Wind Energy LLC?

EIA-860M for August 2026 lists Invenergy Services LLC as the operator (EIA operator ID 49893). The operator is not always the owner.

When did McAdoo Wind Energy LLC start operating?

Its first generator began operating in September 2008, according to EIA-860M.

Does InfraMap have power prices for McAdoo Wind Energy LLC?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to McAdoo Wind Energy LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page