Virginia City Hybrid Energy Center
Coal power plant in Wise County, Virginia. 668 MW of nameplate capacity across 1 generator, operated by Virginia Electric & Power Co.
Also known as EIA plant 56808
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 668 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- July 2012First generator online
- Operator
- Virginia Electric & Power CoEIA operator ID 19876
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Wise County, VA36.9164, −82.3381
- EIA plant ID
- 56808EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Virginia City Hybrid produces
Free · EIA-923Net generation, 2025
2.03 TWh
2,030,714 MWh, final
Capacity factor, 2025
34.7%
2024: 18.3%
January to July 2026
925 GWh
Provisional
Range, 2016 to 2025
0.8–3.5
TWh a year. Low 2023, high 2016
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | 1,132,616 | Not reported | 6 of 12 |
| 2013 | 3,575,852 | Not reported | 12 of 12 |
| 2014 | 2,461,617 | 62.7% | 8 of 12 |
| 2015 | 2,808,749 | 52.3% | 11 of 12 |
| 2016 | 3,505,043 | 59.7% | 12 of 12 |
| 2017 | 3,332,746 | 57.0% | 12 of 12 |
| 2018 | 2,957,761 | 50.5% | 12 of 12 |
| 2019 | 1,185,080 | 20.3% | 12 of 12 |
| 2020 | 870,065 | 14.8% | 12 of 12 |
| 2021 | 953,703 | 16.3% | 12 of 12 |
| 2022 | 1,363,496 | 23.3% | 12 of 12 |
| 2023 | 753,348 | 12.9% | 12 of 12 |
| 2024 | 1,073,012 | 18.3% | 12 of 12 |
| 2025 | 2,030,714 | 34.7% | 12 of 12 |
| 2026 (provisional, partial year) | 924,547 | 27.2% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDCO₂, 2025
2.22M
US short tons. 2024: 1.25M
SO₂, 2025
108
US short tons
NOx, 2025
720
US short tons
CO₂ per MWh, calculated
1.09 t
About 2,187 lb per MWh
2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 56808 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
Not reported
million gallons as reported; not used, see note
Consumption, 2024
Not reported
million gallons
Source
Not reported
Dry cooling
Watershed stress
Very low/none · 0.158
USGS SUI, HUC12 Bull Run-Clinch River
0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Conventional Steam Coal | 668.0 | July 2012 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Virginia Electric & Power Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Virginia City Hybrid Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Virginia City Hybrid
More plants operated by Virginia Electric & Power Co
Questions about Virginia City Hybrid
How much power does Virginia City Hybrid Energy Center produce?
Virginia City Hybrid Energy Center reported 2,030,714 MWh (2.03 TWh) of net generation in 2025, a 34.7% capacity factor on 668 MW of nameplate capacity. From January to July 2026 it reported 925 GWh, which is provisional.
Where is Virginia City Hybrid Energy Center?
Virginia City Hybrid Energy Center is in Wise County, Virginia, at 36.9164, −82.3381. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Virginia City Hybrid Energy Center?
EIA-860M for August 2026 lists Virginia Electric & Power Co as the operator (EIA operator ID 19876). The operator is not always the owner.
When did Virginia City Hybrid Energy Center start operating?
Its first generator began operating in July 2012, according to EIA-860M.
Does InfraMap have power prices for Virginia City Hybrid Energy Center?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Virginia City Hybrid Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page