CoalOperatingPJM

Virginia City Hybrid Energy Center

Coal power plant in Wise County, Virginia. 668 MW of nameplate capacity across 1 generator, operated by Virginia Electric & Power Co.

Also known as EIA plant 56808

Analyst: free account, 1 question a day.

Clinch RiverMineral GapWolf Hills EnergyBuchanan Generation LLCTennessee Eastman OperationsVirginia City Hybrid25 km
Open in the map
6 plants within 48 km, from EIA coordinates.

Key facts

Capacity
668 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 2012First generator online
Operator
Virginia Electric & Power CoEIA operator ID 19876
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Wise County, VA36.9164, −82.3381
EIA plant ID
56808EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Virginia City Hybrid produces

Free · EIA-923

Net generation, 2025

2.03 TWh

2,030,714 MWh, final

Capacity factor, 2025

34.7%

2024: 18.3%

January to July 2026

925 GWh

Provisional

Range, 2016 to 2025

0.8–3.5

TWh a year. Low 2023, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
20121,132,616Not reported6 of 12
20133,575,852Not reported12 of 12
20142,461,61762.7%8 of 12
20152,808,74952.3%11 of 12
20163,505,04359.7%12 of 12
20173,332,74657.0%12 of 12
20182,957,76150.5%12 of 12
20191,185,08020.3%12 of 12
2020870,06514.8%12 of 12
2021953,70316.3%12 of 12
20221,363,49623.3%12 of 12
2023753,34812.9%12 of 12
20241,073,01218.3%12 of 12
20252,030,71434.7%12 of 12
2026 (provisional, partial year)924,54727.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

2.22M

US short tons. 2024: 1.25M

SO₂, 2025

108

US short tons

NOx, 2025

720

US short tons

CO₂ per MWh, calculated

1.09 t

About 2,187 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 56808 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Not reported

Dry cooling

Watershed stress

Very low/none · 0.158

USGS SUI, HUC12 Bull Run-Clinch River

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal668.0July 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Virginia Electric & Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Virginia City Hybrid Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Virginia City Hybrid

More plants operated by Virginia Electric & Power Co

Questions about Virginia City Hybrid

How much power does Virginia City Hybrid Energy Center produce?

Virginia City Hybrid Energy Center reported 2,030,714 MWh (2.03 TWh) of net generation in 2025, a 34.7% capacity factor on 668 MW of nameplate capacity. From January to July 2026 it reported 925 GWh, which is provisional.

Where is Virginia City Hybrid Energy Center?

Virginia City Hybrid Energy Center is in Wise County, Virginia, at 36.9164, −82.3381. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Virginia City Hybrid Energy Center?

EIA-860M for August 2026 lists Virginia Electric & Power Co as the operator (EIA operator ID 19876). The operator is not always the owner.

When did Virginia City Hybrid Energy Center start operating?

Its first generator began operating in July 2012, according to EIA-860M.

Does InfraMap have power prices for Virginia City Hybrid Energy Center?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Virginia City Hybrid Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page