Key facts

Capacity
475 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
September 1958First generator online
Operator
Appalachian Power CoEIA operator ID 733
Grid
PJMBalancing authority PJM
Price nodes
2 PJM nodesResource nodes with prices
Location
Russell County, VA36.9333, −82.1997
EIA plant ID
3775EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Clinch River produces

Free · EIA-923

Net generation, 2025

277 GWh

277,194 MWh, final

Capacity factor, 2025

6.7%

2024: 4.5%

January to July 2026

182 GWh

Provisional. 6 of 7 months reported

Range, 2015 to 2025

189.7–563.5

GWh a year. Low 2024, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20005,009,119Not reported12 of 12
20014,215,709Not reported12 of 12
20024,620,670Not reported12 of 12
20034,382,926Not reported12 of 12
20043,935,584Not reported12 of 12
20053,936,589Not reported12 of 12
20064,120,888Not reported12 of 12
20074,050,361Not reported12 of 12
20083,636,933Not reported12 of 12
20091,525,809Not reported12 of 12
20101,500,92524.0%12 of 12
20111,300,17820.8%12 of 12
2012805,09412.9%12 of 12
2013898,07314.4%12 of 12
2014729,19411.7%12 of 12
2015461,977Not reported12 of 12
2016297,008Not reported12 of 12
2017226,6775.4%12 of 12
2018563,54613.5%12 of 12
2019338,9878.1%12 of 12
2020217,8486.3%10 of 12
2021133,1363.5%11 of 12
202265,3842.4%8 of 12
202369,4381.8%11 of 12
2024189,7124.5%12 of 12
2025277,1946.7%12 of 12
2026 (provisional, partial year)181,6978.8%6 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

204,553

US short tons. 2024: 144,534

SO₂, 2025

89

US short tons

NOx, 2025

235

US short tons

CO₂ per MWh, calculated

0.74 t

About 1,476 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2, 3), matched to EIA plant 3775 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

308

million gallons

Consumption, 2024

191

million gallons

Source

Clinch River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.161

USGS SUI, HUC12 Big Spring Branch-Clinch River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine237.5September 1958
2Natural Gas Steam Turbine237.5December 1958

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Appalachian Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Clinch River and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Clinch River

More plants operated by Appalachian Power Co

Questions about Clinch River

How much power does Clinch River produce?

Clinch River reported 277,194 MWh (277 GWh) of net generation in 2025, a 6.7% capacity factor on 475 MW of nameplate capacity. From January to July 2026 it reported 182 GWh, which is provisional.

Where is Clinch River?

Clinch River is in Russell County, Virginia, at 36.9333, −82.1997. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Clinch River?

EIA-860M for August 2026 lists Appalachian Power Co as the operator (EIA operator ID 733). The operator is not always the owner.

When did Clinch River start operating?

Its first generator began operating in September 1958, according to EIA-860M.

Does InfraMap have power prices for Clinch River?

Yes. InfraMap has PJM day-ahead and real-time prices at 2 price nodes linked to Clinch River, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page