Natural gasOperatingPJM

Dresden Energy Facility

Natural gas power plant in Muskingum County, Ohio. 678.3 MW of nameplate capacity across 3 generators, operated by Appalachian Power Co.

Also known as EIA plant 55350

Analyst: free account, 1 question a day.

Suburban Landfill Gas…KrogerProgress Drive Generation StationDresden Energy Facility25 km
Open in the map
5 plants within 58 km, from EIA coordinates.

Key facts

Capacity
678.3 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
February 2012First generator online
Operator
Appalachian Power CoEIA operator ID 733
Grid
PJMBalancing authority PJM
Price nodes
3 PJM nodesResource nodes with prices
Location
Muskingum County, OH40.0928, −82.0276
EIA plant ID
55350EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Dresden Energy Facility produces

Free · EIA-923

Net generation, 2025

4.19 TWh

4,189,180 MWh, final

Capacity factor, 2025

70.5%

2024: 76.9%

January to July 2026

1.79 TWh

Provisional

Range, 2016 to 2025

3.8–4.6

TWh a year. Low 2017, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012470,48647.4%2 of 12
20132,954,717Not reported12 of 12
20142,605,82365.3%8 of 12
20153,324,34767.4%10 of 12
20163,956,47366.4%12 of 12
20173,761,97163.3%12 of 12
20184,230,99371.2%12 of 12
20194,459,87275.1%12 of 12
2020424,64184.1%1 of 12
20214,097,99469.0%12 of 12
20224,466,73775.2%12 of 12
20233,910,37165.8%12 of 12
20244,580,05576.9%12 of 12
20254,189,18070.5%12 of 12
2026 (provisional, partial year)1,790,97451.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

1.61M

US short tons. 2024: 1.78M

SO₂, 2025

8

US short tons

NOx, 2025

161

US short tons

CO₂ per MWh, calculated

0.39 t

About 770 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1A, 1B), matched to EIA plant 55350 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

891

million gallons

Consumption, 2024

727

million gallons

Source

Muskingum River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.140

USGS SUI, HUC12 Blount Run-Muskingum River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combined Cycle198.9February 2012
2Natural Gas Fired Combined Cycle198.9February 2012
3Natural Gas Fired Combined Cycle280.5February 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Appalachian Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Dresden Energy Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Dresden Energy Facility

More plants operated by Appalachian Power Co

Questions about Dresden Energy Facility

How much power does Dresden Energy Facility produce?

Dresden Energy Facility reported 4,189,180 MWh (4.19 TWh) of net generation in 2025, a 70.5% capacity factor on 678.3 MW of nameplate capacity. From January to July 2026 it reported 1.79 TWh, which is provisional.

Where is Dresden Energy Facility?

Dresden Energy Facility is in Muskingum County, Ohio, at 40.0928, −82.0276. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Dresden Energy Facility?

EIA-860M for August 2026 lists Appalachian Power Co as the operator (EIA operator ID 733). The operator is not always the owner.

When did Dresden Energy Facility start operating?

Its first generator began operating in February 2012, according to EIA-860M.

Does InfraMap have power prices for Dresden Energy Facility?

Yes. InfraMap has PJM day-ahead and real-time prices at 3 price nodes linked to Dresden Energy Facility, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page