Natural gasOperatingPJM

Ceredo Generating Station

Natural gas power plant in Wayne County, West Virginia. 519 MW of nameplate capacity across 6 generators, operated by Appalachian Power Co.

Also known as EIA plant 55276

Analyst: free account, 1 question a day.

Big Sandy Peaker PlantRiverside Generating LLCBig SandyHanging Rock Energy FacilityCeredo20 km
Open in the map
6 plants within 36 km, from EIA coordinates.

Key facts

Capacity
519 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
June 2001First generator online
Operator
Appalachian Power CoEIA operator ID 733
Grid
PJMBalancing authority PJM
Price nodes
6 PJM nodesResource nodes with prices
Location
Wayne County, WV38.3681, −82.5339
EIA plant ID
55276EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Ceredo produces

Free · EIA-923

Net generation, 2025

702 GWh

702,143 MWh, final

Capacity factor, 2025

15.4%

2024: 10.8%

January to July 2026

478 GWh

Provisional

Range, 2015 to 2025

102.9–702.1

GWh a year. Low 2015, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200199,919Not reported6 of 12
200229,696Not reported12 of 12
200317,711Not reported12 of 12
20041,551Not reported12 of 12
200525,035Not reported12 of 12
200683,404Not reported12 of 12
2007132,316Not reported12 of 12
200854,324Not reported12 of 12
200930,322Not reported12 of 12
201047,3411.0%12 of 12
201127,459Not reported12 of 12
201232,687Not reported12 of 12
201340,9400.9%12 of 12
2014164,2683.6%12 of 12
2015102,9162.3%12 of 12
2016110,6272.4%12 of 12
2017155,7743.4%12 of 12
2018154,5863.4%12 of 12
2019363,6358.0%12 of 12
2020110,3482.4%12 of 12
2021331,1547.3%12 of 12
2022398,2738.8%12 of 12
2023469,80010.3%12 of 12
2024492,38610.8%12 of 12
2025702,14315.4%12 of 12
2026 (provisional, partial year)477,57018.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

506,237

US short tons. 2024: 357,989

SO₂, 2025

3

US short tons

NOx, 2025

514

US short tons

CO₂ per MWh, calculated

0.72 t

About 1,442 lb per MWh

6 of 6 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5, 6), matched to EIA plant 55276 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
01Natural Gas Fired Combustion Turbine86.5June 2001
02Natural Gas Fired Combustion Turbine86.5June 2001
03Natural Gas Fired Combustion Turbine86.5June 2001
04Natural Gas Fired Combustion Turbine86.5June 2001
05Natural Gas Fired Combustion Turbine86.5June 2001
06Natural Gas Fired Combustion Turbine86.5June 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Appalachian Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Ceredo Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Ceredo

More plants operated by Appalachian Power Co

Questions about Ceredo

How much power does Ceredo Generating Station produce?

Ceredo Generating Station reported 702,143 MWh (702 GWh) of net generation in 2025, a 15.4% capacity factor on 519 MW of nameplate capacity. From January to July 2026 it reported 478 GWh, which is provisional.

Where is Ceredo Generating Station?

Ceredo Generating Station is in Wayne County, West Virginia, at 38.3681, −82.5339. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Ceredo Generating Station?

EIA-860M for August 2026 lists Appalachian Power Co as the operator (EIA operator ID 733). The operator is not always the owner.

When did Ceredo Generating Station start operating?

Its first generator began operating in June 2001, according to EIA-860M.

Does InfraMap have power prices for Ceredo Generating Station?

Yes. InfraMap has PJM day-ahead and real-time prices at 6 price nodes linked to Ceredo Generating Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page