WindOperatingSPP

Crosswind Energy Project

Wind power plant in Palo Alto County, Iowa. 21 MW of nameplate capacity across 1 generator, operated by Crosswind Holdco LLC.

Also known as Crosswinds Wind Farm · Cross Winds · EIA plant 56859

Analyst: free account, 1 question a day.

Spencer Gas TurbinePoet Bioprocessing Em…GraettingerPalo Alto Wind FarmMilfordCrosswind Energy Project20 km
Open in the map
6 plants within 36 km, from EIA coordinates.

Key facts

Capacity
21 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 2007First generator online
Operator
Crosswind Holdco LLCEIA operator ID 67872
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Palo Alto County, IA43.0475, −94.9228
EIA plant ID
56859EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Crosswind Energy Project produces

Free · EIA-923

Net generation, 2025

57.4 GWh

57,373 MWh, final

Capacity factor, 2025

31.2%

2024: 30.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

55.3–73.6

GWh a year. Low 2024, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
20078,644Not reported12 of 12
200844,384Not reported12 of 12
200953,813Not reported12 of 12
201063,46434.5%12 of 12
201172,76339.6%12 of 12
201276,19441.3%12 of 12
201374,38140.4%12 of 12
201475,75541.2%12 of 12
201573,62140.0%12 of 12
201672,48139.3%12 of 12
201767,28836.6%12 of 12
201862,25033.8%12 of 12
201965,48935.6%12 of 12
202066,87836.3%12 of 12
202168,67937.3%12 of 12
202265,92035.8%12 of 12
202357,83431.4%12 of 12
202455,27130.0%12 of 12
202557,37331.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine21.0June 2007

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Crosswind Holdco LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Crosswind Energy Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Crosswind Energy Project

Questions about Crosswind Energy Project

How much power does Crosswind Energy Project produce?

Crosswind Energy Project reported 57,373 MWh (57.4 GWh) of net generation in 2025, a 31.2% capacity factor on 21 MW of nameplate capacity.

Where is Crosswind Energy Project?

Crosswind Energy Project is in Palo Alto County, Iowa, at 43.0475, −94.9228. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Crosswind Energy Project?

EIA-860M for August 2026 lists Crosswind Holdco LLC as the operator (EIA operator ID 67872). The operator is not always the owner.

When did Crosswind Energy Project start operating?

Its first generator began operating in June 2007, according to EIA-860M.

Does InfraMap have power prices for Crosswind Energy Project?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Crosswind Energy Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page