Bull Creek Wind

Wind power plant in Borden County, Texas. 180 MW of nameplate capacity across 1 generator, operated by Bull Creek Wind LLC.

Also known as Bull Creek · EIA plant 56956

Analyst: free account, 1 question a day.

Stephens Ranch Wind E…Cirrus Wind 1 LLCENGIE Long Draw Solar LLCBorden County BESSJuno Solar ProjectTahoka WindBull Creek Wind10 km
Open in the map
6 plants within 26 km, from EIA coordinates.

Key facts

Capacity
180 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2008First generator online
Operator
Bull Creek Wind LLCEIA operator ID 56222
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Borden County, TX32.9290, −101.5786
EIA plant ID
56956EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bull Creek Wind produces

Free · EIA-923

Net generation, 2025

260 GWh

259,602 MWh, final

Capacity factor, 2025

16.5%

2024: 16.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

133.0–349.4

GWh a year. Low 2019, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009310,703Not reported12 of 12
2010280,02117.8%12 of 12
2011290,537Not reported12 of 12
2012327,052Not reported12 of 12
2013374,52123.8%12 of 12
2014441,71028.0%12 of 12
2015335,82621.3%12 of 12
2016343,44321.7%12 of 12
2017338,76121.5%12 of 12
2018349,44222.2%12 of 12
2019133,0228.4%12 of 12
2020307,72219.5%12 of 12
2021242,12815.4%12 of 12
2022260,13616.5%12 of 12
2023269,03417.1%12 of 12
2024265,22816.8%12 of 12
2025259,60216.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
001Onshore Wind Turbine180.0December 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bull Creek Wind LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bull Creek Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bull Creek Wind

Questions about Bull Creek Wind

How much power does Bull Creek Wind produce?

Bull Creek Wind reported 259,602 MWh (260 GWh) of net generation in 2025, a 16.5% capacity factor on 180 MW of nameplate capacity.

Where is Bull Creek Wind?

Bull Creek Wind is in Borden County, Texas, at 32.9290, −101.5786. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Bull Creek Wind?

EIA-860M for August 2026 lists Bull Creek Wind LLC as the operator (EIA operator ID 56222). The operator is not always the owner.

When did Bull Creek Wind start operating?

Its first generator began operating in December 2008, according to EIA-860M.

Does InfraMap have power prices for Bull Creek Wind?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Bull Creek Wind, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page