ENGIE Long Draw Solar LLC
Solar power plant in Borden County, Texas. 225 MW of nameplate capacity across 1 generator, operated by Engie North America.
Also known as ENGIE Long Draw Solar · ENGIE Long Draw Solar, LLC · EIA plant 62845
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 225 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2020First generator online
- Operator
- Engie North AmericaEIA operator ID 56201
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Borden County, TX32.7414, −101.6218
- EIA plant ID
- 62845EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power ENGIE Long Draw Solar produces
Free · EIA-923Net generation, 2025
519 GWh
519,379 MWh, final
Capacity factor, 2025
26.4%
2024: 26.8%
January to July 2026
270 GWh
Provisional
Range, 2021 to 2025
504.8–540.4
GWh a year. Low 2023, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | 87 | Not reported | 1 of 12 |
| 2021 | 528,607 | 26.8% | 12 of 12 |
| 2022 | 540,447 | 27.4% | 12 of 12 |
| 2023 | 504,811 | 25.6% | 12 of 12 |
| 2024 | 529,770 | 26.8% | 12 of 12 |
| 2025 | 519,379 | 26.4% | 12 of 12 |
| 2026 (provisional, partial year) | 269,625 | 23.6% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| SP1 | Solar Photovoltaic | 225.0 | December 2020 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Engie North America as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query ENGIE Long Draw Solar LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near ENGIE Long Draw Solar
More plants operated by Engie North America
Questions about ENGIE Long Draw Solar
How much power does ENGIE Long Draw Solar LLC produce?
ENGIE Long Draw Solar LLC reported 519,379 MWh (519 GWh) of net generation in 2025, a 26.4% capacity factor on 225 MW of nameplate capacity. From January to July 2026 it reported 270 GWh, which is provisional.
Where is ENGIE Long Draw Solar LLC?
ENGIE Long Draw Solar LLC is in Borden County, Texas, at 32.7414, −101.6218. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates ENGIE Long Draw Solar LLC?
EIA-860M for August 2026 lists Engie North America as the operator (EIA operator ID 56201). The operator is not always the owner.
When did ENGIE Long Draw Solar LLC start operating?
Its first generator began operating in December 2020, according to EIA-860M.
Does InfraMap have power prices for ENGIE Long Draw Solar LLC?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to ENGIE Long Draw Solar LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page