WindOperatingSPP

King Plains Wind Project

Wind power plant in Garfield County, Oklahoma. 248.2 MW of nameplate capacity across 1 generator, operated by Engie North America.

Also known as King Plains · EIA plant 63104

Analyst: free account, 1 question a day.

Covington Solar FarmArmadillo Flats Wind Project, LLCBreckinridge Energy StorageBreckinridge Wind Project LLCChisholm View Wind ProjectWagon Wheel WindKing Plains Wind Project10 km
Open in the map
6 plants within 29 km, from EIA coordinates.

Key facts

Capacity
248.2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2020First generator online
Operator
Engie North AmericaEIA operator ID 56201
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Garfield County, OK36.4001, −97.4775
EIA plant ID
63104EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power King Plains Wind Project produces

Free · EIA-923

Net generation, 2025

593 GWh

592,686 MWh, final

Capacity factor, 2025

27.3%

2024: 33.6%

January to July 2026

487 GWh

Provisional

Range, 2021 to 2025

592.7–808.5

GWh a year. Low 2025, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202099,343Not reported2 of 12
2021808,48037.2%12 of 12
2022697,53032.1%12 of 12
2023806,27637.1%12 of 12
2024732,57333.6%12 of 12
2025592,68627.3%12 of 12
2026 (provisional, partial year)486,70838.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
WTGOnshore Wind Turbine248.2November 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Engie North America as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query King Plains Wind Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near King Plains Wind Project

More plants operated by Engie North America

Questions about King Plains Wind Project

How much power does King Plains Wind Project produce?

King Plains Wind Project reported 592,686 MWh (593 GWh) of net generation in 2025, a 27.3% capacity factor on 248.2 MW of nameplate capacity. From January to July 2026 it reported 487 GWh, which is provisional.

Where is King Plains Wind Project?

King Plains Wind Project is in Garfield County, Oklahoma, at 36.4001, −97.4775. It is in the Southwest Power Pool balancing area (SWPP).

Who operates King Plains Wind Project?

EIA-860M for August 2026 lists Engie North America as the operator (EIA operator ID 56201). The operator is not always the owner.

When did King Plains Wind Project start operating?

Its first generator began operating in November 2020, according to EIA-860M.

Does InfraMap have power prices for King Plains Wind Project?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to King Plains Wind Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page