Key facts

Capacity
106 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
October 2009First generator online
Operator
Blackstone Wind Farm LLCEIA operator ID 56418
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Livingston County, IL41.1508, −88.6233
EIA plant ID
57110EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Blackstone Wind Farm produces

Free · EIA-923

Net generation, 2025

238 GWh

237,659 MWh, final

Capacity factor, 2025

25.6%

2024: 26.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

225.9–286.2

GWh a year. Low 2023, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
200955,182Not reported3 of 12
2010273,47530.6%12 of 12
2011258,87929.0%12 of 12
2012266,06029.7%12 of 12
2013254,56928.5%12 of 12
2014272,13430.5%12 of 12
2015286,21132.0%12 of 12
2016263,02129.4%12 of 12
2017280,27131.4%12 of 12
2018248,38327.8%12 of 12
2019274,34830.7%12 of 12
2020241,03926.9%12 of 12
2021247,226Not reported12 of 12
2022283,58230.5%12 of 12
2023225,91524.3%12 of 12
2024250,08626.9%12 of 12
2025237,65925.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN 1Onshore Wind Turbine106.0October 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Blackstone Wind Farm LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Blackstone Wind Farm LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Blackstone Wind Farm

Questions about Blackstone Wind Farm

How much power does Blackstone Wind Farm LLC produce?

Blackstone Wind Farm LLC reported 237,659 MWh (238 GWh) of net generation in 2025, a 25.6% capacity factor on 106 MW of nameplate capacity.

Where is Blackstone Wind Farm LLC?

Blackstone Wind Farm LLC is in Livingston County, Illinois, at 41.1508, −88.6233. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Blackstone Wind Farm LLC?

EIA-860M for August 2026 lists Blackstone Wind Farm LLC as the operator (EIA operator ID 56418). The operator is not always the owner.

When did Blackstone Wind Farm LLC start operating?

Its first generator began operating in October 2009, according to EIA-860M.

Does InfraMap have power prices for Blackstone Wind Farm LLC?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Blackstone Wind Farm LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page