Roadrunner Solar
Solar power plant in Dona Ana County, New Mexico. 20.2 MW of nameplate capacity across 1 generator, operated by NRG Solar Roadrunner.
Also known as Roadrunner Solar Generating Facility · EIA plant 57338
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 20.2 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- August 2011First generator online
- Operator
- NRG Solar RoadrunnerEIA operator ID 59400
- Grid
- EPEBalancing authority EPE
- Price nodes
- None linkedNo verified ISO node
- Location
- Dona Ana County, NM31.7928, −106.6733
- EIA plant ID
- 57338EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Roadrunner Solar produces
Free · EIA-923Net generation, 2025
47.0 GWh
47,034 MWh, final
Capacity factor, 2025
26.6%
2024: 26.2%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
46.5–72.6
GWh a year. Low 2024, high 2023
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | 18,452 | Not reported | 12 of 12 |
| 2012 | 53,486 | Not reported | 12 of 12 |
| 2013 | 52,977 | 29.9% | 12 of 12 |
| 2014 | 51,428 | 29.1% | 12 of 12 |
| 2015 | 50,526 | 28.6% | 12 of 12 |
| 2016 | 52,367 | 29.5% | 12 of 12 |
| 2017 | 52,234 | 29.5% | 12 of 12 |
| 2018 | 49,503 | 28.0% | 12 of 12 |
| 2019 | 51,221 | 28.9% | 12 of 12 |
| 2020 | 49,850 | 28.1% | 12 of 12 |
| 2021 | 47,445 | 26.8% | 12 of 12 |
| 2022 | 46,991 | 26.6% | 12 of 12 |
| 2023 | 72,567 | 41.0% | 12 of 12 |
| 2024 | 46,468 | 26.2% | 12 of 12 |
| 2025 | 47,034 | 26.6% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Solar Photovoltaic | 20.2 | August 2011 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NRG Solar Roadrunner as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Roadrunner Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Roadrunner Solar
Questions about Roadrunner Solar
How much power does Roadrunner Solar produce?
Roadrunner Solar reported 47,034 MWh (47.0 GWh) of net generation in 2025, a 26.6% capacity factor on 20.2 MW of nameplate capacity.
Where is Roadrunner Solar?
Roadrunner Solar is in Dona Ana County, New Mexico, at 31.7928, −106.6733. It is in the El Paso Electric Company balancing area (EPE).
Who operates Roadrunner Solar?
EIA-860M for August 2026 lists NRG Solar Roadrunner as the operator (EIA operator ID 59400). The operator is not always the owner.
When did Roadrunner Solar start operating?
Its first generator began operating in August 2011, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page