Natural gasOperatingEPE

Rio Grande

Natural gas power plant in Dona Ana County, New Mexico. 348.3 MW of nameplate capacity across 3 generators, operated by El Paso Electric Co.

Also known as Rio Grande Power Plant · EIA plant 2444

Analyst: free account, 1 question a day.

Tenet HospitalFort Bliss (DEA EPIC)Rio Grande10 km
Open in the map
6 plants within 17 km, from EIA coordinates.

Key facts

Capacity
348.3 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 1958First generator online
Operator
El Paso Electric CoEIA operator ID 5701
Grid
EPEBalancing authority EPE
Price nodes
None linkedNo verified ISO node
Location
Dona Ana County, NM31.8047, −106.5472
EIA plant ID
2444EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Rio Grande produces

Free · EIA-923

Net generation, 2025

790 GWh

789,889 MWh, final

Capacity factor, 2025

Not reported

2024: 28.2%

January to July 2026

538 GWh

Provisional

Range, 2016 to 2025

606.4–985.2

GWh a year. Low 2022, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000975,026Not reported12 of 12
2001749,928Not reported12 of 12
2002720,534Not reported12 of 12
2003785,881Not reported12 of 12
2004673,234Not reported12 of 12
2005688,884Not reported12 of 12
2006608,372Not reported12 of 12
2007639,514Not reported12 of 12
2008737,827Not reported12 of 12
2009471,169Not reported12 of 12
2010729,68531.3%12 of 12
2011701,43630.0%12 of 12
2012753,87432.2%12 of 12
2013536,889Not reported8 of 12
2014342,27525.4%5 of 12
2015671,00022.4%11 of 12
2016766,58823.4%12 of 12
2017828,48525.4%12 of 12
2018642,022Not reported12 of 12
2019927,18526.6%12 of 12
2020884,10725.3%12 of 12
2021727,48020.9%12 of 12
2022606,44517.4%12 of 12
2023895,06625.7%12 of 12
2024985,24528.2%12 of 12
2025789,889Not reported12 of 12
2026 (provisional, partial year)538,42030.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

560,876

US short tons. 2024: 607,557

SO₂, 2025

1

US short tons

NOx, 2025

727

US short tons

CO₂ per MWh, calculated

0.71 t

About 1,420 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (6, 7, 8, 9), matched to EIA plant 2444 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

644

million gallons

Consumption, 2024

514

million gallons

Source

Wells

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.310

USGS SUI, HUC12 City of Coronado Hills-Rio Grande

36 of 36 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
7Natural Gas Steam Turbine50.0June 1958
8Natural Gas Steam Turbine166.5July 1972
9Natural Gas Fired Combustion Turbine131.8May 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists El Paso Electric Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Rio Grande and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Rio Grande

More plants operated by El Paso Electric Co

Questions about Rio Grande

How much power does Rio Grande produce?

Rio Grande reported 789,889 MWh (790 GWh) of net generation in 2025. From January to July 2026 it reported 538 GWh, which is provisional.

Where is Rio Grande?

Rio Grande is in Dona Ana County, New Mexico, at 31.8047, −106.5472. It is in the El Paso Electric Company balancing area (EPE).

Who operates Rio Grande?

EIA-860M for August 2026 lists El Paso Electric Co as the operator (EIA operator ID 5701). The operator is not always the owner.

When did Rio Grande start operating?

Its first generator began operating in June 1958, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page