Natural gasOperatingEPE

Newman

Natural gas power plant in El Paso County, Texas. 1,109.8 MW of nameplate capacity across 10 generators, operated by El Paso Electric Co.

Also known as Newman Power Station · EIA plant 3456

Analyst: free account, 1 question a day.

SunE EPE1 LLCBuena Vista Energy CenterFort Bliss (DEA EPIC)New Mexico State UniversityTJX 2021 DG El Paso DCNewman10 km
Open in the map
6 plants within 21 km, from EIA coordinates.

Key facts

Capacity
1,109.8 MWNameplate
Generators
10 operatingEIA-860M, August 2026
Operating since
May 1960First generator online
Operator
El Paso Electric CoEIA operator ID 5701
Grid
EPEBalancing authority EPE
Price nodes
None linkedNo verified ISO node
Location
El Paso County, TX31.9836, −106.4318
EIA plant ID
3456EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Newman produces

Free · EIA-923

Net generation, 2025

4.00 TWh

4,003,483 MWh, final

Capacity factor, 2025

41.2%

2024: 36.9%

January to July 2026

1.82 TWh

Provisional

Range, 2015 to 2025

1.9–4.0

TWh a year. Low 2016, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,065,103Not reported12 of 12
20012,043,853Not reported12 of 12
20021,574,783Not reported12 of 12
20031,536,974Not reported11 of 12
20041,744,648Not reported12 of 12
20051,936,979Not reported12 of 12
20061,661,990Not reported12 of 12
20072,106,720Not reported12 of 12
20081,924,042Not reported12 of 12
20091,897,255Not reported12 of 12
20102,145,656Not reported12 of 12
20112,586,715Not reported12 of 12
20122,761,61434.4%12 of 12
20132,920,758Not reported12 of 12
2014548,50720.9%4 of 12
20152,625,91832.8%12 of 12
20161,904,69623.7%12 of 12
20171,943,64124.3%12 of 12
20183,192,531Not reported12 of 12
20193,162,88940.9%12 of 12
20203,011,78138.9%12 of 12
20212,982,04838.6%12 of 12
20223,047,38139.4%12 of 12
2023306,333Not reported1 of 12
20243,598,33136.9%12 of 12
20254,003,48341.2%12 of 12
2026 (provisional, partial year)1,819,27132.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2024

2.08M

US short tons. 2023: 1.82M

SO₂, 2024

10

US short tons

NOx, 2024

1,544

US short tons

CO₂ per MWh, calculated

0.58 t

About 1,153 lb per MWh

8 of 8 EPA units reported CO₂ in 2024 (**4, **5, 1, 2, 3, GT-6A, GT-6B, SC-7), matched to EIA plant 3456 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

888

million gallons

Consumption, 2024

711

million gallons

Source

Wells/Treated Municipal Waste

Ground, Fresh. Induced-draft tower

Watershed stress

Severe · 0.967

USGS SUI, HUC12 Rattlesnake Tanks

60 of 60 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Steam Turbine81.6May 1960
2Natural Gas Steam Turbine81.6June 1963
3Natural Gas Steam Turbine121.8March 1966
4Natural Gas Fired Combined Cycle120.0August 1975
5CA1Natural Gas Fired Combined Cycle134.0February 2011
5CT1Natural Gas Fired Combined Cycle86.5June 2009
5CT2Natural Gas Fired Combined Cycle86.5June 2009
6Natural Gas Fired Combustion Turbine227.8December 2023
CT1Natural Gas Fired Combined Cycle85.0August 1975
CT2Natural Gas Fired Combined Cycle85.0August 1975

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists El Paso Electric Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Newman and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Newman

More plants operated by El Paso Electric Co

Questions about Newman

How much power does Newman produce?

Newman reported 4,003,483 MWh (4.00 TWh) of net generation in 2025, a 41.2% capacity factor on 1,109.8 MW of nameplate capacity. From January to July 2026 it reported 1.82 TWh, which is provisional.

Where is Newman?

Newman is in El Paso County, Texas, at 31.9836, −106.4318. It is in the El Paso Electric Company balancing area (EPE).

Who operates Newman?

EIA-860M for August 2026 lists El Paso Electric Co as the operator (EIA operator ID 5701). The operator is not always the owner.

When did Newman start operating?

Its first generator began operating in May 1960, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page