WindOperatingMISO

Baldwin Wind LLC

Wind power plant in Burleigh County, North Dakota. 102.4 MW of nameplate capacity across 1 generator, operated by Baldwin Wind LLC.

Also known as Baldwin Wind · EIA plant 57347

Analyst: free account, 1 question a day.

FPL Energy Burleigh C…R M HeskettTesoro Mandan Cogener…Baldwin Wind20 km
Open in the map
6 plants within 37 km, from EIA coordinates.

Key facts

Capacity
102.4 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2010First generator online
Operator
Baldwin Wind LLCEIA operator ID 56688
Grid
MISOBalancing authority MISO
Price nodes
1 SPP nodeResource nodes with prices
Location
Burleigh County, ND47.1133, −100.7086
EIA plant ID
57347EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Baldwin Wind produces

Free · EIA-923

Net generation, 2025

384 GWh

384,087 MWh, final

Capacity factor, 2025

42.8%

2024: 42.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

327.0–422.3

GWh a year. Low 2020, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
201046,863Not reported2 of 12
2011380,40542.4%12 of 12
2012361,26440.2%12 of 12
2013366,09640.8%12 of 12
2014407,04645.4%12 of 12
2015341,27041.5%11 of 12
2016398,34944.3%12 of 12
2017377,72842.1%12 of 12
2018339,70637.9%12 of 12
2019353,86639.4%12 of 12
2020326,98236.4%12 of 12
2021392,37343.7%12 of 12
2022422,30247.1%12 of 12
2023360,38340.2%12 of 12
2024381,14442.4%12 of 12
2025384,08742.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GE1Onshore Wind Turbine102.4December 2010

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Baldwin Wind LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Baldwin Wind LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Baldwin Wind

Questions about Baldwin Wind

How much power does Baldwin Wind LLC produce?

Baldwin Wind LLC reported 384,087 MWh (384 GWh) of net generation in 2025, a 42.8% capacity factor on 102.4 MW of nameplate capacity.

Where is Baldwin Wind LLC?

Baldwin Wind LLC is in Burleigh County, North Dakota, at 47.1133, −100.7086. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Baldwin Wind LLC?

EIA-860M for August 2026 lists Baldwin Wind LLC as the operator (EIA operator ID 56688). The operator is not always the owner.

When did Baldwin Wind LLC start operating?

Its first generator began operating in December 2010, according to EIA-860M.

Does InfraMap have power prices for Baldwin Wind LLC?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Baldwin Wind LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page