FPL Energy Oliver Wind I LLC
Wind power plant in Oliver County, North Dakota. 50.6 MW of nameplate capacity across 1 generator, operated by FPL Energy Oliver County Wind.
Also known as Oliver County Wind Energy Center · EIA plant 56392
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 50.6 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2006First generator online
- Operator
- FPL Energy Oliver County WindEIA operator ID 55696
- Grid
- MISOBalancing authority MISO
- Price nodes
- 1 MISO nodeResource nodes with prices
- Location
- Oliver County, ND47.1528, −101.1977
- EIA plant ID
- 56392EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power FPL Energy Oliver Wind I produces
Free · EIA-923Net generation, 2025
182 GWh
181,632 MWh, final
Capacity factor, 2025
41.0%
2024: 39.8%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
131.5–194.3
GWh a year. Low 2020, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | 12,263 | Not reported | 1 of 12 |
| 2007 | 190,461 | Not reported | 12 of 12 |
| 2008 | 185,998 | Not reported | 12 of 12 |
| 2009 | 180,880 | Not reported | 12 of 12 |
| 2010 | 112,648 | 25.4% | 12 of 12 |
| 2011 | 187,189 | 42.2% | 12 of 12 |
| 2012 | 169,603 | 38.2% | 12 of 12 |
| 2013 | 155,192 | 35.0% | 12 of 12 |
| 2014 | 180,425 | 40.7% | 12 of 12 |
| 2015 | 164,838 | 37.2% | 12 of 12 |
| 2016 | 167,626 | 37.7% | 12 of 12 |
| 2017 | 169,490 | 38.2% | 12 of 12 |
| 2018 | 146,839 | 33.1% | 12 of 12 |
| 2019 | 146,919 | 33.1% | 12 of 12 |
| 2020 | 131,509 | 29.6% | 12 of 12 |
| 2021 | 181,891 | 41.0% | 12 of 12 |
| 2022 | 194,340 | 43.8% | 12 of 12 |
| 2023 | 171,530 | 38.7% | 12 of 12 |
| 2024 | 176,783 | 39.8% | 12 of 12 |
| 2025 | 181,632 | 41.0% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Onshore Wind Turbine | 50.6 | December 2006 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists FPL Energy Oliver County Wind as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query FPL Energy Oliver Wind I LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near FPL Energy Oliver Wind I
Questions about FPL Energy Oliver Wind I
How much power does FPL Energy Oliver Wind I LLC produce?
FPL Energy Oliver Wind I LLC reported 181,632 MWh (182 GWh) of net generation in 2025, a 41.0% capacity factor on 50.6 MW of nameplate capacity.
Where is FPL Energy Oliver Wind I LLC?
FPL Energy Oliver Wind I LLC is in Oliver County, North Dakota, at 47.1528, −101.1977. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates FPL Energy Oliver Wind I LLC?
EIA-860M for August 2026 lists FPL Energy Oliver County Wind as the operator (EIA operator ID 55696). The operator is not always the owner.
When did FPL Energy Oliver Wind I LLC start operating?
Its first generator began operating in December 2006, according to EIA-860M.
Does InfraMap have power prices for FPL Energy Oliver Wind I LLC?
Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to FPL Energy Oliver Wind I LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page