WindOperatingMISO

FPL Energy Oliver Wind I LLC

Wind power plant in Oliver County, North Dakota. 50.6 MW of nameplate capacity across 1 generator, operated by FPL Energy Oliver County Wind.

Also known as Oliver County Wind Energy Center · EIA plant 56392

Analyst: free account, 1 question a day.

Milton R YoungLeland OldsOliver Wind III, LLCCoal CreekOliver Wind IVFPL Energy Oliver Wind I10 km
Open in the map
6 plants within 32 km, from EIA coordinates.

Key facts

Capacity
50.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2006First generator online
Operator
FPL Energy Oliver County WindEIA operator ID 55696
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Oliver County, ND47.1528, −101.1977
EIA plant ID
56392EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power FPL Energy Oliver Wind I produces

Free · EIA-923

Net generation, 2025

182 GWh

181,632 MWh, final

Capacity factor, 2025

41.0%

2024: 39.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

131.5–194.3

GWh a year. Low 2020, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
200612,263Not reported1 of 12
2007190,461Not reported12 of 12
2008185,998Not reported12 of 12
2009180,880Not reported12 of 12
2010112,64825.4%12 of 12
2011187,18942.2%12 of 12
2012169,60338.2%12 of 12
2013155,19235.0%12 of 12
2014180,42540.7%12 of 12
2015164,83837.2%12 of 12
2016167,62637.7%12 of 12
2017169,49038.2%12 of 12
2018146,83933.1%12 of 12
2019146,91933.1%12 of 12
2020131,50929.6%12 of 12
2021181,89141.0%12 of 12
2022194,34043.8%12 of 12
2023171,53038.7%12 of 12
2024176,78339.8%12 of 12
2025181,63241.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine50.6December 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists FPL Energy Oliver County Wind as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query FPL Energy Oliver Wind I LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near FPL Energy Oliver Wind I

Questions about FPL Energy Oliver Wind I

How much power does FPL Energy Oliver Wind I LLC produce?

FPL Energy Oliver Wind I LLC reported 181,632 MWh (182 GWh) of net generation in 2025, a 41.0% capacity factor on 50.6 MW of nameplate capacity.

Where is FPL Energy Oliver Wind I LLC?

FPL Energy Oliver Wind I LLC is in Oliver County, North Dakota, at 47.1528, −101.1977. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates FPL Energy Oliver Wind I LLC?

EIA-860M for August 2026 lists FPL Energy Oliver County Wind as the operator (EIA operator ID 55696). The operator is not always the owner.

When did FPL Energy Oliver Wind I LLC start operating?

Its first generator began operating in December 2006, according to EIA-860M.

Does InfraMap have power prices for FPL Energy Oliver Wind I LLC?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to FPL Energy Oliver Wind I LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page