WindOperatingSPP

Oliver Wind IV

Wind power plant in Oliver County, North Dakota. 198.8 MW of nameplate capacity across 1 generator, operated by Oliver Wind IV, LLC.

Also known as Oliver IV · EIA plant 67502

Analyst: free account, 1 question a day.

Bison 4 Wind Energy CenterBison 2 Wind Energy CenterCoyoteGlen Ullin Energy CenterOliver Wind IV10 km
Open in the map
6 plants within 24 km, from EIA coordinates.

Key facts

Capacity
198.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2024First generator online
Operator
Oliver Wind IV, LLCEIA operator ID 66233
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Oliver County, ND47.1243, −101.6124
EIA plant ID
67502EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Oliver Wind IV produces

Free · EIA-923

Net generation, 2025

799 GWh

799,471 MWh, final

Capacity factor, 2025

45.9%

2024: Not reported

January to July 2026

481 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
202439,699Not reported1 of 12
2025799,47145.9%12 of 12
2026 (provisional, partial year)480,66047.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN4Onshore Wind Turbine198.8December 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Oliver Wind IV, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Oliver Wind IV and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Oliver Wind IV

Questions about Oliver Wind IV

How much power does Oliver Wind IV produce?

Oliver Wind IV reported 799,471 MWh (799 GWh) of net generation in 2025, a 45.9% capacity factor on 198.8 MW of nameplate capacity. From January to July 2026 it reported 481 GWh, which is provisional.

Where is Oliver Wind IV?

Oliver Wind IV is in Oliver County, North Dakota, at 47.1243, −101.6124. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Oliver Wind IV?

EIA-860M for August 2026 lists Oliver Wind IV, LLC as the operator (EIA operator ID 66233). The operator is not always the owner.

When did Oliver Wind IV start operating?

Its first generator began operating in December 2024, according to EIA-860M.

Does InfraMap have power prices for Oliver Wind IV?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Oliver Wind IV, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page