CoalOperatingMISO

Coyote

Coal power plant in Mercer County, North Dakota. 450 MW of nameplate capacity across 1 generator, operated by Otter Tail Power Co.

Also known as Coyote Power Station · EIA plant 8222

Analyst: free account, 1 question a day.

Antelope ValleyOliver Wind IVGlen Ullin Energy CenterBison 4 Wind Energy C…Coyote20 km
Open in the map
6 plants within 33 km, from EIA coordinates.

Key facts

Capacity
450 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 1981First generator online
Operator
Otter Tail Power CoEIA operator ID 14232
Grid
MISOBalancing authority MISO
Price nodes
3 MISO nodesResource nodes with prices
Location
Mercer County, ND47.2214, −101.8157
EIA plant ID
8222EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Coyote produces

Free · EIA-923

Net generation, 2025

2.13 TWh

2,131,056 MWh, final

Capacity factor, 2025

54.1%

2024: 55.9%

January to July 2026

1.36 TWh

Provisional

Range, 2015 to 2025

1.9–3.1

TWh a year. Low 2015, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,743,726Not reported12 of 12
20013,043,997Not reported12 of 12
20023,060,200Not reported12 of 12
20032,743,341Not reported12 of 12
20043,180,023Not reported12 of 12
20053,046,318Not reported12 of 12
20062,844,480Not reported12 of 12
20073,017,383Not reported12 of 12
20082,983,729Not reported12 of 12
20092,498,609Not reported12 of 12
20103,063,98377.7%12 of 12
20113,050,96977.4%12 of 12
20122,294,85458.1%12 of 12
20132,650,88167.2%12 of 12
20142,745,03869.6%12 of 12
20151,921,13848.7%12 of 12
20162,447,56861.9%12 of 12
20172,625,93966.6%12 of 12
20183,070,60777.9%12 of 12
20192,061,73152.3%12 of 12
20202,385,72560.4%12 of 12
20212,464,15962.5%12 of 12
20222,266,74157.5%12 of 12
20232,578,42365.4%12 of 12
20242,208,11555.9%12 of 12
20252,131,05654.1%12 of 12
2026 (provisional, partial year)1,360,18959.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

2.64M

US short tons. 2024: 2.94M

SO₂, 2025

11,404

US short tons

NOx, 2025

5,053

US short tons

CO₂ per MWh, calculated

1.24 t

About 2,474 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (B1), matched to EIA plant 8222 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,248

million gallons

Consumption, 2024

1,154

million gallons

Source

Missouri River

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.391

USGS SUI, HUC12 Engbrecht Cemetery-Knife River

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal450.0May 1981

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Otter Tail Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Coyote and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Coyote

More plants operated by Otter Tail Power Co

Questions about Coyote

How much power does Coyote produce?

Coyote reported 2,131,056 MWh (2.13 TWh) of net generation in 2025, a 54.1% capacity factor on 450 MW of nameplate capacity. From January to July 2026 it reported 1.36 TWh, which is provisional.

Where is Coyote?

Coyote is in Mercer County, North Dakota, at 47.2214, −101.8157. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Coyote?

EIA-860M for August 2026 lists Otter Tail Power Co as the operator (EIA operator ID 14232). The operator is not always the owner.

When did Coyote start operating?

Its first generator began operating in May 1981, according to EIA-860M.

Does InfraMap have power prices for Coyote?

Yes. InfraMap has MISO day-ahead and real-time prices at 3 price nodes linked to Coyote, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page