WindOperatingMISO

Merricourt Wind Energy Center

Wind power plant in McIntosh County, North Dakota. 150 MW of nameplate capacity across 1 generator, operated by Otter Tail Power Co.

Also known as Merricourt · EIA plant 57048

Analyst: free account, 1 question a day.

Foxtail Wind, LLCTatanka Wind Power LLCFPL Energy North Dakota Wind I/IIBadger Wind, LLCMerricourt25 km
Open in the map
4 plants within 43 km, from EIA coordinates.

Key facts

Capacity
150 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2020First generator online
Operator
Otter Tail Power CoEIA operator ID 14232
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
McIntosh County, ND46.1075, −99.0592
EIA plant ID
57048EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Merricourt produces

Free · EIA-923

Net generation, 2025

584 GWh

583,545 MWh, final

Capacity factor, 2025

44.4%

2024: 43.5%

January to July 2026

350 GWh

Provisional

Range, 2021 to 2025

501.6–594.7

GWh a year. Low 2021, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202032,973Not reported1 of 12
2021501,56938.2%12 of 12
2022575,65443.8%12 of 12
2023594,73545.3%12 of 12
2024573,47743.5%12 of 12
2025583,54544.4%12 of 12
2026 (provisional, partial year)350,22845.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine150.0December 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Otter Tail Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Merricourt Wind Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Merricourt

More plants operated by Otter Tail Power Co

Questions about Merricourt

How much power does Merricourt Wind Energy Center produce?

Merricourt Wind Energy Center reported 583,545 MWh (584 GWh) of net generation in 2025, a 44.4% capacity factor on 150 MW of nameplate capacity. From January to July 2026 it reported 350 GWh, which is provisional.

Where is Merricourt Wind Energy Center?

Merricourt Wind Energy Center is in McIntosh County, North Dakota, at 46.1075, −99.0592. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Merricourt Wind Energy Center?

EIA-860M for August 2026 lists Otter Tail Power Co as the operator (EIA operator ID 14232). The operator is not always the owner.

When did Merricourt Wind Energy Center start operating?

Its first generator began operating in December 2020, according to EIA-860M.

Does InfraMap have power prices for Merricourt Wind Energy Center?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Merricourt Wind Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page