Key facts
- Capacity
- 62.4 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- December 2010First generator online
- Operator
- Otter Tail Power CoEIA operator ID 14232
- Grid
- MISOBalancing authority MISO
- Price nodes
- 1 MISO nodeResource nodes with prices
- Location
- Barnes County, ND47.1242, −97.8956
- EIA plant ID
- 57387EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Ashtabula Wind III produces
Free · EIA-923Net generation, 2025
120 GWh
119,861 MWh, final
Capacity factor, 2025
21.9%
2024: 26.0%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
119.9–227.0
GWh a year. Low 2025, high 2017
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | 4,516 | Not reported | 12 of 12 |
| 2011 | 157,826 | 28.9% | 12 of 12 |
| 2012 | 204,982 | 37.4% | 12 of 12 |
| 2013 | 205,497 | 37.6% | 12 of 12 |
| 2014 | 228,550 | 41.8% | 12 of 12 |
| 2015 | 216,766 | 39.7% | 12 of 12 |
| 2016 | 217,168 | 39.6% | 12 of 12 |
| 2017 | 226,965 | 41.5% | 12 of 12 |
| 2018 | 213,682 | 39.1% | 12 of 12 |
| 2019 | 198,904 | 36.4% | 12 of 12 |
| 2020 | 207,149 | 37.8% | 12 of 12 |
| 2021 | 202,740 | 37.1% | 12 of 12 |
| 2022 | 212,555 | 38.9% | 12 of 12 |
| 2023 | 163,864 | 30.0% | 12 of 12 |
| 2024 | 142,585 | 26.0% | 12 of 12 |
| 2025 | 119,861 | 21.9% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| GE16 | Onshore Wind Turbine | 62.4 | December 2010 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Otter Tail Power Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Ashtabula Wind III LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Ashtabula Wind III
More plants operated by Otter Tail Power Co
Questions about Ashtabula Wind III
How much power does Ashtabula Wind III LLC produce?
Ashtabula Wind III LLC reported 119,861 MWh (120 GWh) of net generation in 2025, a 21.9% capacity factor on 62.4 MW of nameplate capacity.
Where is Ashtabula Wind III LLC?
Ashtabula Wind III LLC is in Barnes County, North Dakota, at 47.1242, −97.8956. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Ashtabula Wind III LLC?
EIA-860M for August 2026 lists Otter Tail Power Co as the operator (EIA operator ID 14232). The operator is not always the owner.
When did Ashtabula Wind III LLC start operating?
Its first generator began operating in December 2010, according to EIA-860M.
Does InfraMap have power prices for Ashtabula Wind III LLC?
Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Ashtabula Wind III LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page