CoalOperatingSPP

Antelope Valley

Coal power plant in Mercer County, North Dakota. 954 MW of nameplate capacity across 2 generators, operated by Basin Electric Power Coop.

Also known as Antelope Valley Power Plant · EIA plant 6469

Analyst: free account, 1 question a day.

CoyoteOliver Wind IVGarrisonLeland OldsGlen Ullin Energy CenterBison 4 Wind Energy CenterAntelope Valley25 km
Open in the map
6 plants within 48 km, from EIA coordinates.

Key facts

Capacity
954 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
July 1984First generator online
Operator
Basin Electric Power CoopEIA operator ID 1307
Grid
SPPBalancing authority SWPP
Price nodes
2 SPP nodesResource nodes with prices
Location
Mercer County, ND47.3705, −101.8357
EIA plant ID
6469EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Antelope Valley produces

Free · EIA-923

Net generation, 2025

5.99 TWh

5,992,022 MWh, final

Capacity factor, 2025

71.7%

2024: 62.1%

January to July 2026

3.22 TWh

Provisional

Range, 2015 to 2025

4.9–6.7

TWh a year. Low 2023, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20006,857,825Not reported12 of 12
20016,285,124Not reported12 of 12
20026,317,269Not reported12 of 12
20036,997,354Not reported12 of 12
20046,486,681Not reported12 of 12
20056,437,295Not reported12 of 12
20067,106,993Not reported12 of 12
20076,517,717Not reported12 of 12
20086,412,999Not reported12 of 12
20096,942,247Not reported12 of 12
20106,363,94783.5%12 of 12
20115,327,25269.9%12 of 12
20126,371,68683.4%12 of 12
20136,101,38380.1%12 of 12
20145,838,43176.6%12 of 12
20156,662,52987.4%12 of 12
20165,923,68977.5%12 of 12
20176,270,97682.3%12 of 12
20185,452,190Not reported10 of 12
20196,097,82973.0%12 of 12
20205,694,91368.0%12 of 12
20215,249,51262.8%12 of 12
20225,895,696Not reported12 of 12
20234,934,54959.0%12 of 12
20245,206,78062.1%12 of 12
20255,992,02271.7%12 of 12
2026 (provisional, partial year)3,223,76166.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

7.58M

US short tons. 2024: 6.54M

SO₂, 2025

11,918

US short tons

NOx, 2025

4,471

US short tons

CO₂ per MWh, calculated

1.27 t

About 2,531 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (B1, B2), matched to EIA plant 6469 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

2,858

million gallons

Consumption, 2024

2,858

million gallons

Source

Lake Sakakawea

Surface, Fresh. Forced-draft tower

Watershed stress

Severe · 0.926

USGS SUI, HUC12 West Branch Antelope Creek

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal477.0July 1984
2Conventional Steam Coal477.0July 1986

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Basin Electric Power Coop as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Antelope Valley and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Antelope Valley

More plants operated by Basin Electric Power Coop

Questions about Antelope Valley

How much power does Antelope Valley produce?

Antelope Valley reported 5,992,022 MWh (5.99 TWh) of net generation in 2025, a 71.7% capacity factor on 954 MW of nameplate capacity. From January to July 2026 it reported 3.22 TWh, which is provisional.

Where is Antelope Valley?

Antelope Valley is in Mercer County, North Dakota, at 47.3705, −101.8357. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Antelope Valley?

EIA-860M for August 2026 lists Basin Electric Power Coop as the operator (EIA operator ID 1307). The operator is not always the owner.

When did Antelope Valley start operating?

Its first generator began operating in July 1984, according to EIA-860M.

Does InfraMap have power prices for Antelope Valley?

Yes. InfraMap has SPP day-ahead and real-time prices at 2 price nodes linked to Antelope Valley, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page