Natural gasOperatingSPP

Lonesome Creek Station

Natural gas power plant in McKenzie County, North Dakota. 363 MW of nameplate capacity across 6 generators, operated by Basin Electric Power Coop.

Also known as EIA plant 57943

Analyst: free account, 1 question a day.

Lewis & ClarkPioneer Generation StationLonesome Creek Station25 km
Open in the map
2 plants within 56 km, from EIA coordinates.

Key facts

Capacity
363 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
November 2013First generator online
Operator
Basin Electric Power CoopEIA operator ID 1307
Grid
SPPBalancing authority SWPP
Price nodes
6 SPP nodesResource nodes with prices
Location
McKenzie County, ND47.7967, −103.5786
EIA plant ID
57943EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lonesome Creek Station produces

Free · EIA-923

Net generation, 2025

842 GWh

841,689 MWh, final

Capacity factor, 2025

26.5%

2024: 35.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.3–1.2

TWh a year. Low 2017, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
201314,750Not reported2 of 12
201498,96218.7%12 of 12
2015464,727Not reported12 of 12
2016657,07741.2%12 of 12
2017349,300Not reported12 of 12
2018570,85321.5%12 of 12
2019861,91432.5%12 of 12
2020784,05329.5%12 of 12
2021802,289Not reported12 of 12
2022659,58020.7%12 of 12
20231,155,60436.3%12 of 12
20241,125,53535.3%12 of 12
2025841,68926.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

439,508

US short tons. 2024: 621,953

SO₂, 2025

2

US short tons

NOx, 2025

33

US short tons

CO₂ per MWh, calculated

0.52 t

About 1,044 lb per MWh

6 of 6 EPA units reported CO₂ in 2025 (CT1, CT2, CT3, CT4, CT5, CT6), matched to EIA plant 57943 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
01Natural Gas Fired Combustion Turbine60.5November 2013
02Natural Gas Fired Combustion Turbine60.5January 2015
03Natural Gas Fired Combustion Turbine60.5January 2015
04Natural Gas Fired Combustion Turbine60.5May 2017
05Natural Gas Fired Combustion Turbine60.5May 2017
06Natural Gas Fired Combustion Turbine60.5October 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Basin Electric Power Coop as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lonesome Creek Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lonesome Creek Station

More plants operated by Basin Electric Power Coop

Questions about Lonesome Creek Station

How much power does Lonesome Creek Station produce?

Lonesome Creek Station reported 841,689 MWh (842 GWh) of net generation in 2025, a 26.5% capacity factor on 363 MW of nameplate capacity.

Where is Lonesome Creek Station?

Lonesome Creek Station is in McKenzie County, North Dakota, at 47.7967, −103.5786. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Lonesome Creek Station?

EIA-860M for August 2026 lists Basin Electric Power Coop as the operator (EIA operator ID 1307). The operator is not always the owner.

When did Lonesome Creek Station start operating?

Its first generator began operating in November 2013, according to EIA-860M.

Does InfraMap have power prices for Lonesome Creek Station?

Yes. InfraMap has SPP day-ahead and real-time prices at 6 price nodes linked to Lonesome Creek Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page