Natural gasOperatingSPP

Pioneer Generation Station

Natural gas power plant in Williams County, North Dakota. 897.3 MW of nameplate capacity across 23 generators, operated by Basin Electric Power Coop.

Also known as Pioneer Generating Station · EIA plant 57881

Analyst: free account, 1 question a day.

OREG 2 IncOREG 1 IncLonesome Creek StationPioneer Generation Station25 km
Open in the map
4 plants within 56 km, from EIA coordinates.

Key facts

Capacity
897.3 MWNameplate
Generators
23 operatingEIA-860M, August 2026
Operating since
September 2013First generator online
Operator
Basin Electric Power CoopEIA operator ID 1307
Grid
SPPBalancing authority SWPP
Price nodes
6 SPP nodesResource nodes with prices
Location
Williams County, ND48.2325, −103.9528
EIA plant ID
57881EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Pioneer Generation Station produces

Free · EIA-923

Net generation, 2025

1.73 TWh

1,731,240 MWh, final

Capacity factor, 2025

Not reported

2024: 42.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.2–1.7

TWh a year. Low 2015, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
201322,702Not reported4 of 12
2014110,653Not reported12 of 12
2015202,12212.7%12 of 12
2016305,66119.2%12 of 12
2017263,274Not reported12 of 12
2018398,12215.5%12 of 12
2019506,92419.7%12 of 12
2020498,27519.4%12 of 12
2021662,02225.8%12 of 12
2022735,70128.7%12 of 12
20231,512,99658.9%12 of 12
20241,092,23142.4%12 of 12
20251,731,240Not reported12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

317,561

US short tons. 2024: 373,926

SO₂, 2025

2

US short tons

NOx, 2025

40

US short tons

CO₂ per MWh, calculated

0.18 t

About 367 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (CT1, CT2, CT3), matched to EIA plant 57881 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
01Natural Gas Fired Combustion Turbine60.5September 2013
02Natural Gas Fired Combustion Turbine60.5January 2014
03Natural Gas Fired Combustion Turbine60.5February 2014
04Natural Gas Fired Combustion Turbine245.7August 2025
05Natural Gas Fired Combustion Turbine245.7June 2025
11Natural Gas Internal Combustion Engine9.3January 2017
12Natural Gas Internal Combustion Engine9.3January 2017
13Natural Gas Internal Combustion Engine9.3January 2017
14Natural Gas Internal Combustion Engine9.3January 2017
15Natural Gas Internal Combustion Engine9.3January 2017
16Natural Gas Internal Combustion Engine9.3January 2017
17Natural Gas Internal Combustion Engine9.3January 2017
18Natural Gas Internal Combustion Engine9.3January 2017
19Natural Gas Internal Combustion Engine9.3January 2017
20Natural Gas Internal Combustion Engine9.3January 2017
21Natural Gas Internal Combustion Engine9.3January 2017
22Natural Gas Internal Combustion Engine9.3January 2017
31Natural Gas Internal Combustion Engine18.8April 2025
32Natural Gas Internal Combustion Engine18.8April 2025
33Natural Gas Internal Combustion Engine18.8April 2025
34Natural Gas Internal Combustion Engine18.8April 2025
35Natural Gas Internal Combustion Engine18.8April 2025
36Natural Gas Internal Combustion Engine18.8April 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Basin Electric Power Coop as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Pioneer Generation Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Pioneer Generation Station

More plants operated by Basin Electric Power Coop

Questions about Pioneer Generation Station

How much power does Pioneer Generation Station produce?

Pioneer Generation Station reported 1,731,240 MWh (1.73 TWh) of net generation in 2025.

Where is Pioneer Generation Station?

Pioneer Generation Station is in Williams County, North Dakota, at 48.2325, −103.9528. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Pioneer Generation Station?

EIA-860M for August 2026 lists Basin Electric Power Coop as the operator (EIA operator ID 1307). The operator is not always the owner.

When did Pioneer Generation Station start operating?

Its first generator began operating in September 2013, according to EIA-860M.

Does InfraMap have power prices for Pioneer Generation Station?

Yes. InfraMap has SPP day-ahead and real-time prices at 6 price nodes linked to Pioneer Generation Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page