WindOperatingMISO

Oliver Wind III, LLC

Wind power plant in Morton County, North Dakota. 99.3 MW of nameplate capacity across 1 generator, operated by Oliver Wind III, LLC.

Also known as Oliver Wind III · Oliver III · EIA plant 60905

Analyst: free account, 1 question a day.

Milton R YoungFPL Energy Oliver Wind I LLCFPL Energy Oliver Wind II LLCR M HeskettTesoro Mandan Cogeneration PlantBison 4 Wind Energy C…Oliver Wind III10 km
Open in the map
6 plants within 29 km, from EIA coordinates.

Key facts

Capacity
99.3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2017First generator online
Operator
Oliver Wind III, LLCEIA operator ID 60562
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Morton County, ND46.9571, −101.1681
EIA plant ID
60905EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Oliver Wind III produces

Free · EIA-923

Net generation, 2025

380 GWh

380,104 MWh, final

Capacity factor, 2025

43.7%

2024: 47.8%

January to July 2026

228 GWh

Provisional

Range, 2017 to 2025

380.1–459.7

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017444,236Not reported12 of 12
2018425,72348.9%12 of 12
2019429,88449.4%12 of 12
2020457,14152.4%12 of 12
2021404,37346.5%12 of 12
2022459,69952.8%12 of 12
2023412,13647.4%12 of 12
2024416,94847.8%12 of 12
2025380,10443.7%12 of 12
2026 (provisional, partial year)227,91545.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
WT1Onshore Wind Turbine99.3January 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Oliver Wind III, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Oliver Wind III, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Oliver Wind III

Questions about Oliver Wind III

How much power does Oliver Wind III, LLC produce?

Oliver Wind III, LLC reported 380,104 MWh (380 GWh) of net generation in 2025, a 43.7% capacity factor on 99.3 MW of nameplate capacity. From January to July 2026 it reported 228 GWh, which is provisional.

Where is Oliver Wind III, LLC?

Oliver Wind III, LLC is in Morton County, North Dakota, at 46.9571, −101.1681. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Oliver Wind III, LLC?

EIA-860M for August 2026 lists Oliver Wind III, LLC as the operator (EIA operator ID 60562). The operator is not always the owner.

When did Oliver Wind III, LLC start operating?

Its first generator began operating in January 2017, according to EIA-860M.

Does InfraMap have power prices for Oliver Wind III, LLC?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Oliver Wind III, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page