Oliver Wind III, LLC
Wind power plant in Morton County, North Dakota. 99.3 MW of nameplate capacity across 1 generator, operated by Oliver Wind III, LLC.
Also known as Oliver Wind III · Oliver III · EIA plant 60905
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 99.3 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- January 2017First generator online
- Operator
- Oliver Wind III, LLCEIA operator ID 60562
- Grid
- MISOBalancing authority MISO
- Price nodes
- 1 MISO nodeResource nodes with prices
- Location
- Morton County, ND46.9571, −101.1681
- EIA plant ID
- 60905EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Oliver Wind III produces
Free · EIA-923Net generation, 2025
380 GWh
380,104 MWh, final
Capacity factor, 2025
43.7%
2024: 47.8%
January to July 2026
228 GWh
Provisional
Range, 2017 to 2025
380.1–459.7
GWh a year. Low 2025, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | 444,236 | Not reported | 12 of 12 |
| 2018 | 425,723 | 48.9% | 12 of 12 |
| 2019 | 429,884 | 49.4% | 12 of 12 |
| 2020 | 457,141 | 52.4% | 12 of 12 |
| 2021 | 404,373 | 46.5% | 12 of 12 |
| 2022 | 459,699 | 52.8% | 12 of 12 |
| 2023 | 412,136 | 47.4% | 12 of 12 |
| 2024 | 416,948 | 47.8% | 12 of 12 |
| 2025 | 380,104 | 43.7% | 12 of 12 |
| 2026 (provisional, partial year) | 227,915 | 45.1% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · MISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| WT1 | Onshore Wind Turbine | 99.3 | January 2017 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Oliver Wind III, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Oliver Wind III, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Oliver Wind III
Questions about Oliver Wind III
How much power does Oliver Wind III, LLC produce?
Oliver Wind III, LLC reported 380,104 MWh (380 GWh) of net generation in 2025, a 43.7% capacity factor on 99.3 MW of nameplate capacity. From January to July 2026 it reported 228 GWh, which is provisional.
Where is Oliver Wind III, LLC?
Oliver Wind III, LLC is in Morton County, North Dakota, at 46.9571, −101.1681. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Oliver Wind III, LLC?
EIA-860M for August 2026 lists Oliver Wind III, LLC as the operator (EIA operator ID 60562). The operator is not always the owner.
When did Oliver Wind III, LLC start operating?
Its first generator began operating in January 2017, according to EIA-860M.
Does InfraMap have power prices for Oliver Wind III, LLC?
Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Oliver Wind III, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page