CoalOperatingMISO

Milton R Young

Coal power plant in Oliver County, North Dakota. 734 MW of nameplate capacity across 2 generators, operated by Minnkota Power Coop, Inc.

Also known as Milton R. Young Power Plant · EIA plant 2823

Analyst: free account, 1 question a day.

FPL Energy Oliver Wind I LLCFPL Energy Oliver Wind II LLCOliver Wind III, LLCLeland OldsBison 4 Wind Energy CenterMilton R Young10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
734 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
October 1970First generator online
Operator
Minnkota Power Coop, IncEIA operator ID 12658
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Oliver County, ND47.0659, −101.2131
EIA plant ID
2823EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Milton R Young produces

Free · EIA-923

Net generation, 2025

3.72 TWh

3,723,950 MWh, final

Capacity factor, 2025

57.9%

2024: 67.3%

January to July 2026

2.50 TWh

Provisional

Range, 2015 to 2025

3.7–5.3

TWh a year. Low 2025, high 2017

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20005,005,119Not reported12 of 12
20014,637,171Not reported12 of 12
20025,117,272Not reported12 of 12
20034,806,010Not reported12 of 12
20044,782,502Not reported12 of 12
20055,117,830Not reported12 of 12
20064,861,874Not reported12 of 12
20074,510,071Not reported12 of 12
20085,412,978Not reported12 of 12
20095,018,507Not reported12 of 12
20104,535,43070.5%12 of 12
20115,110,41679.5%12 of 12
20125,163,67480.1%12 of 12
20134,208,69565.5%12 of 12
20144,557,99270.9%12 of 12
20154,902,36376.2%12 of 12
20164,360,782Not reported12 of 12
20175,330,95982.9%12 of 12
20184,908,95176.3%12 of 12
20194,705,18773.2%12 of 12
20204,667,52372.4%12 of 12
20214,474,99369.6%12 of 12
20224,158,046Not reported12 of 12
20234,503,89670.0%12 of 12
20244,340,32967.3%12 of 12
20253,723,95057.9%12 of 12
2026 (provisional, partial year)2,499,77566.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

4.57M

US short tons. 2024: 5.24M

SO₂, 2025

1,844

US short tons

NOx, 2025

6,791

US short tons

CO₂ per MWh, calculated

1.23 t

About 2,453 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (B1, B2), matched to EIA plant 2823 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

150,229

million gallons

Consumption, 2024

0

million gallons

Source

Nelson Lake

Surface, Fresh. Once-through with cooling pond

Watershed stress

Severe · 0.829

USGS SUI, HUC12 Nelson Lake-Square Butte Creek

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal257.0October 1970
2Conventional Steam Coal477.0April 1977

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Minnkota Power Coop, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Milton R Young and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Milton R Young

Questions about Milton R Young

How much power does Milton R Young produce?

Milton R Young reported 3,723,950 MWh (3.72 TWh) of net generation in 2025, a 57.9% capacity factor on 734 MW of nameplate capacity. From January to July 2026 it reported 2.50 TWh, which is provisional.

Where is Milton R Young?

Milton R Young is in Oliver County, North Dakota, at 47.0659, −101.2131. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Milton R Young?

EIA-860M for August 2026 lists Minnkota Power Coop, Inc as the operator (EIA operator ID 12658). The operator is not always the owner.

When did Milton R Young start operating?

Its first generator began operating in October 1970, according to EIA-860M.

Does InfraMap have power prices for Milton R Young?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Milton R Young, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page