Natural gasOperatingCAISO

Sentinel Energy Center, LLC

Natural gas power plant in Riverside County, California. 800 MW of nameplate capacity across 8 generators, operated by Sentinel Energy Center LLC.

Also known as CPV Sentinel Power Plant · EIA plant 57482

Analyst: free account, 1 question a day.

Desert Peak Energy Storage IDesert Peak Energy Storage IISan Gorgonio Westwind…Mountain View I & IIKaren Avenue Wind FarmSan Gorgonio Windplan…Sentinel Energy Center1 km
Open in the map
6 plants within 1.8 km, from EIA coordinates.

Key facts

Capacity
800 MWNameplate
Generators
8 operatingEIA-860M, August 2026
Operating since
May 2013First generator online
Operator
Sentinel Energy Center LLCEIA operator ID 56887
Grid
CAISOBalancing authority CISO
Price nodes
8 CAISO nodesResource nodes with prices
Location
Riverside County, CA33.9342, −116.5714
EIA plant ID
57482EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sentinel Energy Center produces

Free · EIA-923

Net generation, 2025

140 GWh

140,118 MWh, final

Capacity factor, 2025

2.0%

2024: 6.0%

January to July 2026

76.8 GWh

Provisional

Range, 2015 to 2025

140.1–656.9

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013309,195Not reported8 of 12
2014490,5257.0%12 of 12
2015656,8549.4%12 of 12
2016449,3106.4%12 of 12
2017489,2367.0%12 of 12
2018485,6586.9%12 of 12
2019576,7038.2%12 of 12
2020608,2268.7%12 of 12
2021615,9118.8%12 of 12
2022509,2197.3%12 of 12
2023554,3647.9%12 of 12
2024419,8056.0%12 of 12
2025140,1182.0%12 of 12
2026 (provisional, partial year)76,8031.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

80,952

US short tons. 2024: Not reported

SO₂, 2025

0

US short tons

NOx, 2025

9

US short tons

CO₂ per MWh, calculated

0.58 t

About 1,155 lb per MWh

8 of 8 EPA units reported CO₂ in 2025 (1, 2, 3, 4, 5, 6, 7, 8), matched to EIA plant 57482 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combustion Turbine100.0May 2013
CTG2Natural Gas Fired Combustion Turbine100.0May 2013
CTG3Natural Gas Fired Combustion Turbine100.0May 2013
CTG4Natural Gas Fired Combustion Turbine100.0May 2013
CTG5Natural Gas Fired Combustion Turbine100.0May 2013
CTG6Natural Gas Fired Combustion Turbine100.0May 2013
CTG7Natural Gas Fired Combustion Turbine100.0May 2013
CTG8Natural Gas Fired Combustion Turbine100.0May 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Sentinel Energy Center LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sentinel Energy Center, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sentinel Energy Center

Questions about Sentinel Energy Center

How much power does Sentinel Energy Center, LLC produce?

Sentinel Energy Center, LLC reported 140,118 MWh (140 GWh) of net generation in 2025, a 2.0% capacity factor on 800 MW of nameplate capacity. From January to July 2026 it reported 76.8 GWh, which is provisional.

Where is Sentinel Energy Center, LLC?

Sentinel Energy Center, LLC is in Riverside County, California, at 33.9342, −116.5714. It is in the California Independent System Operator balancing area (CISO).

Who operates Sentinel Energy Center, LLC?

EIA-860M for August 2026 lists Sentinel Energy Center LLC as the operator (EIA operator ID 56887). The operator is not always the owner.

When did Sentinel Energy Center, LLC start operating?

Its first generator began operating in May 2013, according to EIA-860M.

Does InfraMap have power prices for Sentinel Energy Center, LLC?

Yes. InfraMap has CAISO day-ahead and real-time prices at 8 price nodes linked to Sentinel Energy Center, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page