HydroOperatingPACW

Tieton Dam Hydro Electric Project

Hydro power plant in Yakima County, Washington. 13.8 MW of nameplate capacity across 2 generators, operated by City of Burbank Water and Power - (CA).

Also known as EIA plant 57496

Analyst: free account, 1 question a day.

CowichePackwoodRozaPenstemon Solar ProjectTieton Dam Hydro Elec…25 km
Open in the map
6 plants within 58 km, from EIA coordinates.

Key facts

Capacity
13.8 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
September 2006First generator online
Operator
City of Burbank Water and Power - (CA)EIA operator ID 2507
Grid
PACWBalancing authority PACW
Price nodes
None linkedNo verified ISO node
Location
Yakima County, WA46.6580, −121.1287
EIA plant ID
57496EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Tieton Dam Hydro Electric Project produces

Free · EIA-923

Net generation, 2025

24.2 GWh

24,159 MWh, final

Capacity factor, 2025

20.0%

2024: 14.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

17.7–60.4

GWh a year. Low 2024, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
201038,85532.1%12 of 12
201163,30052.4%12 of 12
201257,80747.7%12 of 12
201343,77336.2%12 of 12
201464,12753.0%12 of 12
201539,11332.4%12 of 12
201653,72244.3%12 of 12
201760,42050.0%12 of 12
201848,38440.0%12 of 12
201929,14924.1%12 of 12
202037,36830.8%12 of 12
202142,91535.5%12 of 12
202253,78044.5%12 of 12
202337,31730.9%12 of 12
202417,74914.6%12 of 12
202524,15920.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
UNIT1Conventional Hydroelectric6.9September 2006
UNIT2Conventional Hydroelectric6.9September 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Burbank Water and Power - (CA) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Tieton Dam Hydro Electric Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Tieton Dam Hydro Electric Project

More plants operated by City of Burbank Water and Power - (CA)

Questions about Tieton Dam Hydro Electric Project

How much power does Tieton Dam Hydro Electric Project produce?

Tieton Dam Hydro Electric Project reported 24,159 MWh (24.2 GWh) of net generation in 2025, a 20.0% capacity factor on 13.8 MW of nameplate capacity.

Where is Tieton Dam Hydro Electric Project?

Tieton Dam Hydro Electric Project is in Yakima County, Washington, at 46.6580, −121.1287. It is in the PacifiCorp - West balancing area (PACW).

Who operates Tieton Dam Hydro Electric Project?

EIA-860M for August 2026 lists City of Burbank Water and Power - (CA) as the operator (EIA operator ID 2507). The operator is not always the owner.

When did Tieton Dam Hydro Electric Project start operating?

Its first generator began operating in September 2006, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page