Walnut Creek Energy Park

Natural gas power plant in Los Angeles County, California. 500 MW of nameplate capacity across 5 generators, operated by Walnut Creek LLC.

Also known as EIA plant 57515

Analyst: free account, 1 question a day.

MM West CovinaPuente Hills Energy RecoveryCoyote CreekWalnut Creek Energy P…5 km
Open in the map
6 plants within 9.6 km, from EIA coordinates.

Key facts

Capacity
500 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
April 2013First generator online
Operator
Walnut Creek LLCEIA operator ID 59980
Grid
CAISOBalancing authority CISO
Price nodes
5 CAISO nodesResource nodes with prices
Location
Los Angeles County, CA34.0087, −117.9449
EIA plant ID
57515EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Walnut Creek Energy Park produces

Free · EIA-923

Net generation, 2025

45.1 GWh

45,060 MWh, final

Capacity factor, 2025

1.0%

2024: 6.3%

January to July 2026

16.2 GWh

Provisional. 6 of 7 months reported

Range, 2015 to 2025

45.1–492.3

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013316,129Not reported11 of 12
2014489,37411.2%12 of 12
2015439,71510.0%12 of 12
2016445,55010.1%12 of 12
2017347,1607.9%12 of 12
2018382,0258.7%12 of 12
2019456,23710.4%12 of 12
2020419,4409.6%12 of 12
2021249,8125.7%12 of 12
2022492,25811.2%12 of 12
2023371,3608.5%12 of 12
2024278,1826.3%12 of 12
202545,0601.0%12 of 12
2026 (provisional, partial year)16,1550.7%6 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

26,525

US short tons. 2024: 152,118

SO₂, 2025

0

US short tons

NOx, 2025

2

US short tons

CO₂ per MWh, calculated

0.59 t

About 1,177 lb per MWh

5 of 5 EPA units reported CO₂ in 2025 (GT1, GT2, GT3, GT4, GT5), matched to EIA plant 57515 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Natural Gas Fired Combustion Turbine100.0April 2013
GT2Natural Gas Fired Combustion Turbine100.0April 2013
GT3Natural Gas Fired Combustion Turbine100.0April 2013
GT4Natural Gas Fired Combustion Turbine100.0April 2013
GT5Natural Gas Fired Combustion Turbine100.0May 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Walnut Creek LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Walnut Creek Energy Park and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Walnut Creek Energy Park

Questions about Walnut Creek Energy Park

How much power does Walnut Creek Energy Park produce?

Walnut Creek Energy Park reported 45,060 MWh (45.1 GWh) of net generation in 2025, a 1.0% capacity factor on 500 MW of nameplate capacity. From January to July 2026 it reported 16.2 GWh, which is provisional.

Where is Walnut Creek Energy Park?

Walnut Creek Energy Park is in Los Angeles County, California, at 34.0087, −117.9449. It is in the California Independent System Operator balancing area (CISO).

Who operates Walnut Creek Energy Park?

EIA-860M for August 2026 lists Walnut Creek LLC as the operator (EIA operator ID 59980). The operator is not always the owner.

When did Walnut Creek Energy Park start operating?

Its first generator began operating in April 2013, according to EIA-860M.

Does InfraMap have power prices for Walnut Creek Energy Park?

Yes. InfraMap has CAISO day-ahead and real-time prices at 5 price nodes linked to Walnut Creek Energy Park, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page