Natural gasOperatingCAISO

University of California San Diego Hybri

Natural gas power plant in San Diego County, California. 33 MW of nameplate capacity across 3 generators, operated by University of California San Diego.

Also known as EIA plant 57584

Analyst: free account, 1 question a day.

W PlantKilroy SolarUniversity of Califor…2 km
Open in the map
6 plants within 6.8 km, from EIA coordinates.

Key facts

Capacity
33 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
July 2001First generator online
Operator
University of California San DiegoEIA operator ID 56918
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
San Diego County, CA32.8747, −117.2392
EIA plant ID
57584EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power University of California San Diego Hybri produces

Free · EIA-923

Net generation, 2025

207 GWh

206,760 MWh, final. 11 of 12 months reported

Capacity factor, 2025

Not reported

2024: 76.6%

January to July 2026

134 GWh

Provisional

Range, 2015 to 2024

199.8–229.2

GWh a year. Low 2015, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010190,28365.8%12 of 12
2011198,00368.5%12 of 12
2012186,23364.2%12 of 12
2013199,218Not reported12 of 12
2014203,05570.2%12 of 12
2015199,76371.6%12 of 12
2016212,29773.3%12 of 12
2017209,01172.4%12 of 12
2018206,38071.5%12 of 12
2019229,15479.3%12 of 12
2020201,29069.5%12 of 12
2021201,51469.7%12 of 12
2022221,87576.8%12 of 12
2023220,60776.4%12 of 12
2024221,92776.6%12 of 12
2025206,760Not reported11 of 12
2026 (provisional, partial year)134,08679.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
NT2Natural Gas Fired Combined Cycle15.0July 2001
ST1Natural Gas Fired Combined Cycle15.0July 2001
STGNatural Gas Fired Combined Cycle3.0July 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists University of California San Diego as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query University of California San Diego Hybri and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near University of California San Diego Hybri

More plants operated by University of California San Diego

Questions about University of California San Diego Hybri

How much power does University of California San Diego Hybri produce?

University of California San Diego Hybri reported 206,760 MWh (207 GWh) of net generation in 2025. From January to July 2026 it reported 134 GWh, which is provisional. 11 of 12 months were reported for 2025.

Where is University of California San Diego Hybri?

University of California San Diego Hybri is in San Diego County, California, at 32.8747, −117.2392. It is in the California Independent System Operator balancing area (CISO).

Who operates University of California San Diego Hybri?

EIA-860M for August 2026 lists University of California San Diego as the operator (EIA operator ID 56918). The operator is not always the owner.

When did University of California San Diego Hybri start operating?

Its first generator began operating in July 2001, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page