Avra Valley Solar

Solar power plant in Pima County, Arizona. 25 MW of nameplate capacity across 1 generator, operated by Solar Avra Valley LLC.

Also known as EIA plant 57657

Analyst: free account, 1 question a day.

Picture Rocks Solar, LLCBroadway 2 - Tucson Phase IITucson - CAVSARPSerranoNorth LoopAvra Valley Solar5 km
Open in the map
6 plants within 15 km, from EIA coordinates.

Key facts

Capacity
25 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 2013First generator online
Operator
Solar Avra Valley LLCEIA operator ID 64614
Grid
TEPCBalancing authority TEPC
Price nodes
None linkedNo verified ISO node
Location
Pima County, AZ32.3717, −111.2828
EIA plant ID
57657EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Avra Valley Solar produces

Free · EIA-923

Net generation, 2025

61.5 GWh

61,488 MWh, final

Capacity factor, 2025

28.1%

2024: 28.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

61.5–74.8

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
20122,125Not reported1 of 12
201375,812Not reported12 of 12
201474,15431.9%12 of 12
201558,37730.2%10 of 12
201674,84632.2%12 of 12
201773,72531.8%12 of 12
201872,16631.1%12 of 12
201968,38429.5%12 of 12
202065,281Not reported12 of 12
202167,21530.7%12 of 12
202263,82529.1%12 of 12
202364,75829.6%12 of 12
202462,53328.5%12 of 12
202561,48828.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Solar Photovoltaic25.0January 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Solar Avra Valley LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Avra Valley Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Avra Valley Solar

Questions about Avra Valley Solar

How much power does Avra Valley Solar produce?

Avra Valley Solar reported 61,488 MWh (61.5 GWh) of net generation in 2025, a 28.1% capacity factor on 25 MW of nameplate capacity.

Where is Avra Valley Solar?

Avra Valley Solar is in Pima County, Arizona, at 32.3717, −111.2828. It is in the Tucson Electric Power Company balancing area (TEPC).

Who operates Avra Valley Solar?

EIA-860M for August 2026 lists Solar Avra Valley LLC as the operator (EIA operator ID 64614). The operator is not always the owner.

When did Avra Valley Solar start operating?

Its first generator began operating in January 2013, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page