East Blackland Solar Project 1
Solar power plant in Travis County, Texas. 144 MW of nameplate capacity across 1 generator, operated by Deriva Energy.
Also known as Pflugerville solar park · EIA plant 57659
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 144 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- July 2021First generator online
- Operator
- Deriva EnergyEIA operator ID 65411
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Travis County, TX30.4214, −97.4614
- EIA plant ID
- 57659EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power East Blackland Solar Project 1 produces
Free · EIA-923Net generation, 2025
277 GWh
277,344 MWh, final
Capacity factor, 2025
22.0%
2024: 21.5%
January to July 2026
160 GWh
Provisional
Range, 2022 to 2025
271.9–320.1
GWh a year. Low 2024, high 2022
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | 147,828 | 28.0% | 5 of 12 |
| 2022 | 320,142 | 25.4% | 12 of 12 |
| 2023 | 303,588 | 24.1% | 12 of 12 |
| 2024 | 271,896 | 21.5% | 12 of 12 |
| 2025 | 277,344 | 22.0% | 12 of 12 |
| 2026 (provisional, partial year) | 159,920 | 21.8% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| PSF | Solar Photovoltaic | 144.0 | July 2021 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Deriva Energy as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query East Blackland Solar Project 1 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near East Blackland Solar Project 1
More plants operated by Deriva Energy
Questions about East Blackland Solar Project 1
How much power does East Blackland Solar Project 1 produce?
East Blackland Solar Project 1 reported 277,344 MWh (277 GWh) of net generation in 2025, a 22.0% capacity factor on 144 MW of nameplate capacity. From January to July 2026 it reported 160 GWh, which is provisional.
Where is East Blackland Solar Project 1?
East Blackland Solar Project 1 is in Travis County, Texas, at 30.4214, −97.4614. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates East Blackland Solar Project 1?
EIA-860M for August 2026 lists Deriva Energy as the operator (EIA operator ID 65411). The operator is not always the owner.
When did East Blackland Solar Project 1 start operating?
Its first generator began operating in July 2021, according to EIA-860M.
Does InfraMap have power prices for East Blackland Solar Project 1?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to East Blackland Solar Project 1, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page