WindOperatingMISO

Rippey Wind Farm

Wind power plant in Greene County, Iowa. 50 MW of nameplate capacity across 1 generator, operated by Greenbacker Renewable Energy Corporation.

Also known as Rippey · EIA plant 57830

Analyst: free account, 1 question a day.

Junction Hilltop Wind FarmGrand JunctionBeaver Creek WindHardin Hilltop Wind LLCPerry Customer Hosted 1MW Solar ProjectRippey Wind Farm10 km
Open in the map
5 plants within 21 km, from EIA coordinates.

Key facts

Capacity
50 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2012First generator online
Operator
Greenbacker Renewable Energy CorporationEIA operator ID 60025
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Greene County, IA42.0061, −94.2378
EIA plant ID
57830EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Rippey Wind Farm produces

Free · EIA-923

Net generation, 2025

167 GWh

166,619 MWh, final

Capacity factor, 2025

38.0%

2024: 35.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

124.6–188.0

GWh a year. Low 2021, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
201250,42345.7%3 of 12
2013173,12139.5%12 of 12
2014163,74637.4%12 of 12
2015165,20537.7%12 of 12
2016188,00242.8%12 of 12
2017182,75741.7%12 of 12
2018162,61737.1%12 of 12
2019166,43838.0%12 of 12
2020149,27734.0%12 of 12
2021124,56128.4%12 of 12
2022159,93436.5%12 of 12
2023151,08434.5%12 of 12
2024154,42235.2%12 of 12
2025166,61938.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
NORDOnshore Wind Turbine50.0August 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Greenbacker Renewable Energy Corporation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Rippey Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Rippey Wind Farm

More plants operated by Greenbacker Renewable Energy Corporation

Questions about Rippey Wind Farm

How much power does Rippey Wind Farm produce?

Rippey Wind Farm reported 166,619 MWh (167 GWh) of net generation in 2025, a 38.0% capacity factor on 50 MW of nameplate capacity.

Where is Rippey Wind Farm?

Rippey Wind Farm is in Greene County, Iowa, at 42.0061, −94.2378. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Rippey Wind Farm?

EIA-860M for August 2026 lists Greenbacker Renewable Energy Corporation as the operator (EIA operator ID 60025). The operator is not always the owner.

When did Rippey Wind Farm start operating?

Its first generator began operating in August 2012, according to EIA-860M.

Does InfraMap have power prices for Rippey Wind Farm?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Rippey Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page