Hawkeye Wind Farm

Wind power plant in Bremer County, Iowa. 35 MW of nameplate capacity across 1 generator, operated by Greenbacker Renewable Energy Corporation.

Also known as Hawkeye · EIA plant 57832

Analyst: free account, 1 question a day.

SumnerNew HamptonChickasaw Wind FarmDPC MadisonWaverly Municipal Electric North PlantHawkeye Wind Farm25 km
Open in the map
6 plants within 41 km, from EIA coordinates.

Key facts

Capacity
35 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
October 2012First generator online
Operator
Greenbacker Renewable Energy CorporationEIA operator ID 60025
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Bremer County, IA42.9489, −92.0622
EIA plant ID
57832EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hawkeye Wind Farm produces

Free · EIA-923

Net generation, 2025

171 GWh

170,574 MWh, final

Capacity factor, 2025

55.6%

2024: 56.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

97.1–173.3

GWh a year. Low 2023, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
201236,199Not reported3 of 12
2013133,10442.2%12 of 12
2014139,29044.2%12 of 12
2015146,754Not reported12 of 12
2016136,57044.4%12 of 12
2017140,20645.7%12 of 12
2018127,36441.5%12 of 12
2019128,35141.9%12 of 12
2020129,92742.3%12 of 12
2021130,70042.6%12 of 12
2022148,30748.4%12 of 12
202397,11431.7%12 of 12
2024173,27656.4%12 of 12
2025170,57455.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
NORDOnshore Wind Turbine35.0October 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Greenbacker Renewable Energy Corporation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hawkeye Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hawkeye Wind Farm

More plants operated by Greenbacker Renewable Energy Corporation

Questions about Hawkeye Wind Farm

How much power does Hawkeye Wind Farm produce?

Hawkeye Wind Farm reported 170,574 MWh (171 GWh) of net generation in 2025, a 55.6% capacity factor on 35 MW of nameplate capacity.

Where is Hawkeye Wind Farm?

Hawkeye Wind Farm is in Bremer County, Iowa, at 42.9489, −92.0622. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Hawkeye Wind Farm?

EIA-860M for August 2026 lists Greenbacker Renewable Energy Corporation as the operator (EIA operator ID 60025). The operator is not always the owner.

When did Hawkeye Wind Farm start operating?

Its first generator began operating in October 2012, according to EIA-860M.

Does InfraMap have power prices for Hawkeye Wind Farm?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Hawkeye Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page