Natural gasOperatingPACE

Hurricane City Power

Natural gas power plant in Washington County, Utah. 10 MW of nameplate capacity across 5 generators, operated by Hurricane City Power - (UT).

Also known as EIA plant 57899

Analyst: free account, 1 question a day.

Quail Creek Hydro Plant #1Washington City Elect…Millcreek Power GenerationSolomon Generating FacilityHurricane City Power20 km
Open in the map
6 plants within 33 km, from EIA coordinates.

Key facts

Capacity
10 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
July 2004First generator online
Operator
Hurricane City Power - (UT)EIA operator ID 9128
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Washington County, UT37.1856, −113.2975
EIA plant ID
57899EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hurricane City Power produces

Free · EIA-923

Net generation, 2025

7.00 GWh

7,003 MWh, final

Capacity factor, 2025

5.3%

2024: 5.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.0–8.3

GWh a year. Low 2017, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
20111,3440.9%12 of 12
20122,7701.8%12 of 12
20133,998Not reported12 of 12
20142,296Not reported12 of 12
20152,6672.0%12 of 12
20162,6052.0%12 of 12
20172,0241.5%12 of 12
20184,8953.7%12 of 12
20192,8482.2%12 of 12
20204,8333.6%12 of 12
20214,6163.5%12 of 12
20228,2586.2%12 of 12
20233,4542.6%12 of 12
20247,3845.6%12 of 12
20257,0035.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
4Natural Gas Internal Combustion Engine2.0July 2004
5Natural Gas Internal Combustion Engine2.0July 2004
6Natural Gas Internal Combustion Engine2.0June 2006
7Natural Gas Internal Combustion Engine2.0May 2007
8Natural Gas Internal Combustion Engine2.0May 2007

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hurricane City Power - (UT) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hurricane City Power and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hurricane City Power

Questions about Hurricane City Power

How much power does Hurricane City Power produce?

Hurricane City Power reported 7,003 MWh (7.00 GWh) of net generation in 2025, a 5.3% capacity factor on 10 MW of nameplate capacity.

Where is Hurricane City Power?

Hurricane City Power is in Washington County, Utah, at 37.1856, −113.2975. It is in the PacifiCorp - East balancing area (PACE).

Who operates Hurricane City Power?

EIA-860M for August 2026 lists Hurricane City Power - (UT) as the operator (EIA operator ID 9128). The operator is not always the owner.

When did Hurricane City Power start operating?

Its first generator began operating in July 2004, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page