WindOperatingNWMT

Musselshell Wind Project Two LLC

Wind power plant in Wheatland County, Montana. 10 MW of nameplate capacity across 1 generator, operated by Musselshell Wind Project Two LLC.

Also known as Musselshell Wind II · Musselshell II · EIA plant 57965

Analyst: free account, 1 question a day.

Beaver Creek Wind FacilityJudith Gap Wind Energy CenterMagpie Solar, LLCBig Timber Wind FarmMusselshell Wind Proj…25 km
Open in the map
6 plants within 48 km, from EIA coordinates.

Key facts

Capacity
10 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2012First generator online
Operator
Musselshell Wind Project Two LLCEIA operator ID 57338
Grid
NWMTBalancing authority NWMT
Price nodes
None linkedNo verified ISO node
Location
Wheatland County, MT46.2753, −109.4828
EIA plant ID
57965EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Musselshell Wind Project Two produces

Free · EIA-923

Net generation, 2025

27.2 GWh

27,227 MWh, final

Capacity factor, 2025

31.1%

2024: 30.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

15.7–33.7

GWh a year. Low 2019, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012324Not reported1 of 12
201321,934Not reported12 of 12
201431,14035.5%12 of 12
201528,25632.3%12 of 12
201629,16033.2%12 of 12
201729,76334.0%12 of 12
201822,40025.6%12 of 12
201915,67817.9%12 of 12
202030,86835.1%12 of 12
202128,76932.8%12 of 12
202233,67038.4%12 of 12
202323,62327.0%12 of 12
202426,51430.2%12 of 12
202527,22731.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MS02Onshore Wind Turbine10.0December 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Musselshell Wind Project Two LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Musselshell Wind Project Two LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Musselshell Wind Project Two

Questions about Musselshell Wind Project Two

How much power does Musselshell Wind Project Two LLC produce?

Musselshell Wind Project Two LLC reported 27,227 MWh (27.2 GWh) of net generation in 2025, a 31.1% capacity factor on 10 MW of nameplate capacity.

Where is Musselshell Wind Project Two LLC?

Musselshell Wind Project Two LLC is in Wheatland County, Montana, at 46.2753, −109.4828. It is in the NorthWestern Energy (NWMT) balancing area (NWMT).

Who operates Musselshell Wind Project Two LLC?

EIA-860M for August 2026 lists Musselshell Wind Project Two LLC as the operator (EIA operator ID 57338). The operator is not always the owner.

When did Musselshell Wind Project Two LLC start operating?

Its first generator began operating in December 2012, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page