Natural gasOperatingERCOT

Central Utility Plant - Texas A&M

Natural gas power plant in Brazos County, Texas. 45.1 MW of nameplate capacity across 2 generators, operated by Texas A&M, Utilities & Energy Services.

Also known as EIA plant 58151

Analyst: free account, 1 question a day.

OTHERTexasA&MDansbyBlue Jay Solar I, LLCHighway 6 BESSCentral Utility Plant…10 km
Open in the map
6 plants within 28 km, from EIA coordinates.

Key facts

Capacity
45.1 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2011First generator online
Operator
Texas A&M, Utilities & Energy ServicesEIA operator ID 58113
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Brazos County, TX30.6178, −96.3433
EIA plant ID
58151EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Central Utility Plant - Texas A&M produces

Free · EIA-923

Net generation, 2025

134 GWh

133,770 MWh, final

Capacity factor, 2025

33.9%

2024: 27.4%

January to July 2026

18.9 GWh

Provisional

Range, 2015 to 2025

82.0–241.6

GWh a year. Low 2021, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012240,23354.6%12 of 12
2013234,118Not reported12 of 12
2014219,34750.0%12 of 12
2015209,38547.7%12 of 12
2016241,55954.9%12 of 12
2017184,29042.0%12 of 12
2018166,09737.8%12 of 12
2019196,61644.8%12 of 12
2020135,29430.7%12 of 12
202182,018Not reported12 of 12
2022119,95330.4%12 of 12
2023127,81632.4%12 of 12
2024108,60227.4%12 of 12
2025133,77033.9%12 of 12
2026 (provisional, partial year)18,9058.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GTG01Natural Gas Fired Combined Cycle34.1August 2011
STG02Natural Gas Fired Combined Cycle11.0August 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Texas A&M, Utilities & Energy Services as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Central Utility Plant - Texas A&M and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Central Utility Plant - Texas A&M

Questions about Central Utility Plant - Texas A&M

How much power does Central Utility Plant - Texas A&M produce?

Central Utility Plant - Texas A&M reported 133,770 MWh (134 GWh) of net generation in 2025, a 33.9% capacity factor on 45.1 MW of nameplate capacity. From January to July 2026 it reported 18.9 GWh, which is provisional.

Where is Central Utility Plant - Texas A&M?

Central Utility Plant - Texas A&M is in Brazos County, Texas, at 30.6178, −96.3433. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Central Utility Plant - Texas A&M?

EIA-860M for August 2026 lists Texas A&M, Utilities & Energy Services as the operator (EIA operator ID 58113). The operator is not always the owner.

When did Central Utility Plant - Texas A&M start operating?

Its first generator began operating in August 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page