Highway 6 BESS
Battery storage project in Brazos County, Texas. 9.9 MW of nameplate capacity across 1 generator, operated by Hwy 6 Infra LLC.
Also known as EIA plant 69323
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 9.9 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- June 2026First generator online
- Operator
- Hwy 6 Infra LLCEIA operator ID 67415
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- Brazos County, TX30.4423, −96.1314
- EIA plant ID
- 69323EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Highway 6 BESS produces
Free · EIA-923EIA-923 has no net generation reported for this plant.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| HWY6 | Batteries | 9.9 | June 2026 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hwy 6 Infra LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
300 analyst questions a month, plus MCP
Query Highway 6 BESS and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Highway 6 BESS
Questions about Highway 6 BESS
Where is Highway 6 BESS?
Highway 6 BESS is in Brazos County, Texas, at 30.4423, −96.1314. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Highway 6 BESS?
EIA-860M for August 2026 lists Hwy 6 Infra LLC as the operator (EIA operator ID 67415). The operator is not always the owner.
When did Highway 6 BESS start operating?
Its first generator began operating in June 2026, according to EIA-860M.
Does InfraMap have power prices for Highway 6 BESS?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Highway 6 BESS, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page