Battery storageOperatingERCOT

Highway 6 BESS

Battery storage project in Brazos County, Texas. 9.9 MW of nameplate capacity across 1 generator, operated by Hwy 6 Infra LLC.

Also known as EIA plant 69323

Analyst: free account, 1 question a day.

Grimes County SolarTenaska Frontier Generation StationCentral Utility Plant…TX15 Limousin Oak StorageBlue Jay Solar I, LLCBryan (TX)Highway 6 BESS10 km
Open in the map
6 plants within 32 km, from EIA coordinates.

Key facts

Capacity
9.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 2026First generator online
Operator
Hwy 6 Infra LLCEIA operator ID 67415
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Brazos County, TX30.4423, −96.1314
EIA plant ID
69323EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Highway 6 BESS produces

Free · EIA-923

EIA-923 has no net generation reported for this plant.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
HWY6Batteries9.9June 2026

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hwy 6 Infra LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Highway 6 BESS and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Highway 6 BESS

Questions about Highway 6 BESS

Where is Highway 6 BESS?

Highway 6 BESS is in Brazos County, Texas, at 30.4423, −96.1314. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Highway 6 BESS?

EIA-860M for August 2026 lists Hwy 6 Infra LLC as the operator (EIA operator ID 67415). The operator is not always the owner.

When did Highway 6 BESS start operating?

Its first generator began operating in June 2026, according to EIA-860M.

Does InfraMap have power prices for Highway 6 BESS?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Highway 6 BESS, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page