SolarOperatingLDWP

CSU Northridge Plant

Solar power plant in Los Angeles County, California. 1.3 MW of nameplate capacity across 3 generators, operated by California State University, Northridge.

Also known as EIA plant 58422

Analyst: free account, 1 question a day.

Nordhoff Place8500 Balboa PV, LLCPAC Aviation SolarPacific AviationCSU Northridge Plant2 km
Open in the map
6 plants within 4.5 km, from EIA coordinates.

Key facts

Capacity
1.3 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
March 2003First generator online
Operator
California State University, NorthridgeEIA operator ID 58416
Grid
LDWPBalancing authority LDWP
Price nodes
None linkedNo verified ISO node
Location
Los Angeles County, CA34.2433, −118.5306
EIA plant ID
58422EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power CSU Northridge Plant produces

Free · EIA-923

Net generation, 2025

1.55 GWh

1,554 MWh, final

Capacity factor, 2025

Not reported

2024: 16.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–7.8

GWh a year. Low 2015, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
20135,91035.5%12 of 12
201400.0%12 of 12
201500.0%12 of 12
20167,055Not reported12 of 12
20177,79944.5%12 of 12
20183,978Not reported8 of 12
201991013.0%12 of 12
202074214.1%12 of 12
202199919.0%12 of 12
20221,05320.0%12 of 12
202381915.6%12 of 12
202486516.4%12 of 12
20251,554Not reported12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
B2PVSolar Photovoltaic0.4April 2005
E6PVSolar Photovoltaic0.2March 2003
G6PVSolar Photovoltaic0.7July 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists California State University, Northridge as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query CSU Northridge Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near CSU Northridge Plant

Questions about CSU Northridge Plant

How much power does CSU Northridge Plant produce?

CSU Northridge Plant reported 1,554 MWh (1.55 GWh) of net generation in 2025.

Where is CSU Northridge Plant?

CSU Northridge Plant is in Los Angeles County, California, at 34.2433, −118.5306. It is in the Los Angeles Department of Water and Power balancing area (LDWP).

Who operates CSU Northridge Plant?

EIA-860M for August 2026 lists California State University, Northridge as the operator (EIA operator ID 58416). The operator is not always the owner.

When did CSU Northridge Plant start operating?

Its first generator began operating in March 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page