Natural gasOperatingERCOT

Ector County Energy Center

Natural gas power plant in Ector County, Texas. 358.8 MW of nameplate capacity across 2 generators, operated by Ector County Generation, LLC.

Also known as EIA plant 58471

Analyst: free account, 1 question a day.

2W Permian Solar Project HybridOxy Renewable Energy - GoldsmithGoldsmithN. Mary FrancisBakkeEctor County10 km
Open in the map
6 plants within 26 km, from EIA coordinates.

Key facts

Capacity
358.8 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
August 2015First generator online
Operator
Ector County Generation, LLCEIA operator ID 65431
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Ector County, TX32.0692, −102.5856
EIA plant ID
58471EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Ector County produces

Free · EIA-923

Net generation, 2025

935 GWh

934,612 MWh, final

Capacity factor, 2025

Not reported

2024: 20.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

49.9–934.6

GWh a year. Low 2021, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
201561,169Not reported5 of 12
2016230,091Not reported12 of 12
2017241,3437.7%12 of 12
2018469,08914.9%12 of 12
2019516,39016.4%12 of 12
2020667,25521.2%12 of 12
202149,9031.6%12 of 12
2022118,7803.8%12 of 12
2023425,62613.5%12 of 12
2024648,67320.6%12 of 12
2025934,612Not reported12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

640,564

US short tons. 2024: 449,907

SO₂, 2025

8

US short tons

NOx, 2025

161

US short tons

CO₂ per MWh, calculated

0.69 t

About 1,371 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CT-1, CT-2), matched to EIA plant 58471 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combustion Turbine179.4August 2015
CTG2Natural Gas Fired Combustion Turbine179.4August 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Ector County Generation, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Ector County Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Ector County

Questions about Ector County

How much power does Ector County Energy Center produce?

Ector County Energy Center reported 934,612 MWh (935 GWh) of net generation in 2025.

Where is Ector County Energy Center?

Ector County Energy Center is in Ector County, Texas, at 32.0692, −102.5856. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Ector County Energy Center?

EIA-860M for August 2026 lists Ector County Generation, LLC as the operator (EIA operator ID 65431). The operator is not always the owner.

When did Ector County Energy Center start operating?

Its first generator began operating in August 2015, according to EIA-860M.

Does InfraMap have power prices for Ector County Energy Center?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Ector County Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page