SolarOperatingMISO

Indy Solar III, LLC

Solar power plant in Marion County, Indiana. 8.6 MW of nameplate capacity across 1 generator, operated by Onward Energy.

Also known as EIA plant 58553

Analyst: free account, 1 question a day.

IND Community Solar Farm 1st PhaseHarding StreetINDY IIIBelmontIndy GrocersIndy Solar III5 km
Open in the map
6 plants within 8.9 km, from EIA coordinates.

Key facts

Capacity
8.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2013First generator online
Operator
Onward EnergyEIA operator ID 60453
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Marion County, IN39.6594, −86.2597
EIA plant ID
58553EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Indy Solar III produces

Free · EIA-923

Net generation, 2025

13.0 GWh

13,040 MWh, final

Capacity factor, 2025

17.3%

2024: 17.9%

January to July 2026

8.58 GWh

Provisional

Range, 2015 to 2025

11.1–17.4

GWh a year. Low 2021, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013355Not reported1 of 12
201415,08320.0%12 of 12
201514,79119.6%12 of 12
201617,37823.0%12 of 12
201714,35519.1%12 of 12
201813,72718.2%12 of 12
201913,47217.9%12 of 12
202013,14517.4%12 of 12
202111,13114.8%12 of 12
202212,00215.9%12 of 12
202312,89217.1%12 of 12
202413,52217.9%12 of 12
202513,04017.3%12 of 12
2026 (provisional, partial year)8,57819.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Solar Photovoltaic8.6December 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Onward Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Indy Solar III, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Indy Solar III

More plants operated by Onward Energy

Questions about Indy Solar III

How much power does Indy Solar III, LLC produce?

Indy Solar III, LLC reported 13,040 MWh (13.0 GWh) of net generation in 2025, a 17.3% capacity factor on 8.6 MW of nameplate capacity. From January to July 2026 it reported 8.58 GWh, which is provisional.

Where is Indy Solar III, LLC?

Indy Solar III, LLC is in Marion County, Indiana, at 39.6594, −86.2597. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Indy Solar III, LLC?

EIA-860M for August 2026 lists Onward Energy as the operator (EIA operator ID 60453). The operator is not always the owner.

When did Indy Solar III, LLC start operating?

Its first generator began operating in December 2013, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page