Wood biomassOperatingPJM

Halifax County Biomass

Wood biomass power plant in Halifax County, Virginia. 49.9 MW of nameplate capacity across 1 generator, operated by South Boston Energy LLC.

Also known as Halifax County Biomass Plant · EIA plant 58560

Analyst: free account, 1 question a day.

Halifax CSG LLCHalifax (VA)Sunnybrook Solar Project - HybridPiney Creek SolarCrystal Hill SolarHalifax County Biomass10 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
49.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2013First generator online
Operator
South Boston Energy LLCEIA operator ID 58524
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Halifax County, VA36.7014, −78.8733
EIA plant ID
58560EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Halifax County Biomass produces

Free · EIA-923

Net generation, 2025

359 GWh

358,696 MWh, final

Capacity factor, 2025

82.1%

2024: 80.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

181.9–358.7

GWh a year. Low 2020, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
201339,080Not reported3 of 12
2014202,62546.4%12 of 12
2015255,25858.4%12 of 12
2016186,27446.4%11 of 12
2017213,72248.9%12 of 12
2018260,29159.5%12 of 12
2019206,56647.3%12 of 12
2020181,91441.5%12 of 12
2021244,81256.0%12 of 12
2022347,96079.6%12 of 12
2023298,41968.3%12 of 12
2024351,64280.2%12 of 12
2025358,69682.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
STG1Wood/Wood Waste Biomass49.9November 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists South Boston Energy LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Halifax County Biomass and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Halifax County Biomass

Questions about Halifax County Biomass

How much power does Halifax County Biomass produce?

Halifax County Biomass reported 358,696 MWh (359 GWh) of net generation in 2025, a 82.1% capacity factor on 49.9 MW of nameplate capacity.

Where is Halifax County Biomass?

Halifax County Biomass is in Halifax County, Virginia, at 36.7014, −78.8733. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Halifax County Biomass?

EIA-860M for August 2026 lists South Boston Energy LLC as the operator (EIA operator ID 58524). The operator is not always the owner.

When did Halifax County Biomass start operating?

Its first generator began operating in November 2013, according to EIA-860M.

Does InfraMap have power prices for Halifax County Biomass?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Halifax County Biomass, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page