WindOperatingSPP

Buckeye Wind Energy Center

Wind power plant in Ellis County, Kansas. 200.5 MW of nameplate capacity across 1 generator, operated by Invenergy Services LLC.

Also known as Buckeye · EIA plant 58767

Analyst: free account, 1 question a day.

Goodman Energy CenterFort Hays State Unive…Cedar Bluff Wind, LLCStocktonBuckeye25 km
Open in the map
6 plants within 51 km, from EIA coordinates.

Key facts

Capacity
200.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2015First generator online
Operator
Invenergy Services LLCEIA operator ID 49893
Grid
SPPBalancing authority SWPP
Price nodes
3 SPP nodesResource nodes with prices
Location
Ellis County, KS39.0039, −99.4142
EIA plant ID
58767EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Buckeye produces

Free · EIA-923

Net generation, 2025

561 GWh

561,167 MWh, final

Capacity factor, 2025

32.0%

2024: 40.4%

January to July 2026

226 GWh

Provisional

Range, 2016 to 2025

561.2–821.6

GWh a year. Low 2025, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015278,870Not reported5 of 12
2016820,01945.4%12 of 12
2017793,98944.1%12 of 12
2018759,01042.1%12 of 12
2019806,88244.8%12 of 12
2020821,619Not reported12 of 12
2021748,60742.6%12 of 12
2022789,59245.0%12 of 12
2023743,71242.3%12 of 12
2024712,23340.4%12 of 12
2025561,16732.0%12 of 12
2026 (provisional, partial year)225,76822.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine200.5August 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Invenergy Services LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Buckeye Wind Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Buckeye

More plants operated by Invenergy Services LLC

Questions about Buckeye

How much power does Buckeye Wind Energy Center produce?

Buckeye Wind Energy Center reported 561,167 MWh (561 GWh) of net generation in 2025, a 32.0% capacity factor on 200.5 MW of nameplate capacity. From January to July 2026 it reported 226 GWh, which is provisional.

Where is Buckeye Wind Energy Center?

Buckeye Wind Energy Center is in Ellis County, Kansas, at 39.0039, −99.4142. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Buckeye Wind Energy Center?

EIA-860M for August 2026 lists Invenergy Services LLC as the operator (EIA operator ID 49893). The operator is not always the owner.

When did Buckeye Wind Energy Center start operating?

Its first generator began operating in August 2015, according to EIA-860M.

Does InfraMap have power prices for Buckeye Wind Energy Center?

Yes. InfraMap has SPP day-ahead and real-time prices at 3 price nodes linked to Buckeye Wind Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page